Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Shorter commodity cycles reshaping trading: McKinsey takeaways for mine planners

    March 3, 2026|

    Reviewed by Tom Sullivan

    Shorter commodity cycles reshaping trading: McKinsey takeaways for mine planners

    First reported on MINING.com

    30 Second Briefing

    Shorter, more frequent commodity volatility cycles are eroding supercycle-based trading models and concentrating value among firms with advanced AI and strong control of physical flows, with sector-wide trading revenues at $69 billion in 2025, roughly double pre-pandemic levels. McKinsey estimates around $20 billion of optimisation value remains untapped in oil and gas products, and early agentic AI deployments are delivering 50–60% efficiency gains in support functions by automating post-trade operations and compressing deal cycles. In a January 2026 survey of 150 professionals, 49% favoured partnership-led expansion of trading capabilities, rising to 78% in Asia and 80% in the US, with metals, mining, oil and gas targeted for the largest investment increases.

    Technical Brief

    • Trading revenues slipped from $72 billion in 2024 to $69 billion in 2025 across commodities.
    • Coverage spans power, gas, metals and mining, agriculture, oil and products, and liquefied natural gas.
    • Value capture is consolidating into a smaller cohort of firms with advanced trading capabilities and capital access.
    • Shorter volatility cycles are described as creating a “permanent divergence” between capability-rich and lagging organisations.
    • Agentic AI is specifically credited with automating post-trade operations and compressing digital workflow bottlenecks.
    • Survey base comprised more than 150 commodity trading professionals polled in January 2026 across global regions.
    • Asia shows 78% preference for partnership-led trading expansion, compared with 80% in the United States.
    • Metals and mining, plus oil and gas, are singled out as priority sectors for trading capability investment growth.

    Our Take

    The $1 billion Equinox Gold sale of Brazilian gold assets to CMOC sits within a Latin American M&A wave our database tracks at roughly three-quarters of global mining deal value in the first three quarters of 2025, signalling that portfolio reshaping in gold and copper is increasingly being executed via asset swaps and carve-outs rather than greenfield builds.

    McKinsey & Company’s role in both this trading-cycle analysis and earlier work on mining productivity stagnation (noted in our December 2025 coverage) suggests that shorter commodity cycles in copper, lithium and other critical minerals are likely to collide with already weak productivity, putting extra pressure on operators to use trading and optimisation desks as a core value lever rather than a side activity.

    With 78–80% of surveyed trading professionals in Asia and the US favouring partnerships, miners like BHP and gold producers exposed to copper and battery metals are likely to find more receptive counterparties for JV-style marketing and offtake structures, especially in regions such as Latin America and Africa that dominate recent M&A flows in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Rare Earths Americas IPO: project pipeline and funding priorities for mine planners
    Mining
    about 4 hours ago

    Rare Earths Americas IPO: project pipeline and funding priorities for mine planners

    Rare Earths Americas has filed an SEC registration statement for an underwritten IPO on NYSE American under ticker “REA”, targeting heavy rare earths projects in the US and Brazil, with Cantor as lead bookrunner and Stifel as bookrunner alongside Canaccord Genuity and B. Riley Securities as co-managers. Proceeds are earmarked for land acquisition, drilling, metallurgical test work, permitting and SK-1300 technical report preparation at the Shiloh project in Georgia. Additional funds will support exploration, land consolidation, metallurgy, engineering and permitting at the Alpha and Constellation projects in Bahia and Minas Gerais, plus early-stage work at Homer and Liberty Peak.

    Almonty Industries’ US move and Gentung restart: supply chain notes for mine planners
    Mining
    about 6 hours ago

    Almonty Industries’ US move and Gentung restart: supply chain notes for mine planners

    Global tungsten producer Almonty Industries has shifted its corporate headquarters from Toronto to Dillon, Montana, aligning its base with the recently acquired Gentung-Browns Lake tungsten project, a former Union Carbide operation with existing water rights and pipework. The company, which restarted the Sangdong mine in South Korea in March after a 30-year hiatus to supply US markets, plans to recommence Gentung production as early as late 2026 using reconditioned plant from its Spanish operations, pending an extraction permit. The move follows a $90 million oversubscribed Nasdaq IPO and a $129 million follow-on financing, signalling a push to build a US-aligned tungsten supply chain outside China.

    Omai resource update in Guyana: mine planning and PEA takeaways for engineers
    Mining
    about 6 hours ago

    Omai resource update in Guyana: mine planning and PEA takeaways for engineers

    Omai Gold Mines has increased total resources at its past-producing Omai project in central Guyana to 8 million oz., up from 6.5 million oz., with indicated resources now 38.1 million tonnes at 2.04 g/t and inferred 106.6 million tonnes at 1.59 g/t, after 18,000 metres of drilling and updated modelling. The Wenot open-pit deposit now holds about 1.45 million oz. indicated at 1.59 g/t and 3.9 million oz. inferred at 1.33 g/t, while the Gilt Creek underground resource has grown to roughly 2.5 million oz. at 3.26 g/t. A new PEA due within three months is expected to evaluate a combined open-pit/underground operation targeting 250,000–300,000 oz. per year with a larger mill, ahead of a planned prefeasibility study and 50,000-metre drill campaign.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.