Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Sheffield regeneration developers: infrastructure and density insights for engineers

    February 26, 2026|

    Reviewed by Joe Ashwell

    Sheffield regeneration developers: infrastructure and density insights for engineers

    First reported on The Construction Index

    30 Second Briefing

    Developers have been appointed to convert two former industrial sites at Furnace Hill and Neepsend in Sheffield into roughly 1,180 homes across 5 hectares of brownfield land, backed by nearly £70m of government funding for land assembly and infrastructure. Furnace Hill will see about 750 units delivered by a Capital&Centric/Great Places joint venture, split evenly between affordable, home ownership and build-to-rent tenures. Igloo Regeneration will deliver around 430 homes at Neepsend, with roughly 20% affordable and 10% later-living units, both schemes designed to connect into the city’s tram network.

    Technical Brief

    • Nearly £70m of central government funding is earmarked specifically for land assembly and enabling infrastructure.
    • Five hectares of former industrial land implies extensive remediation, contamination management and possible foundation reuse assessments.
    • Brownfield status and derelict buildings suggest demolition sequencing, waste classification and off-site disposal logistics will be critical.

    Our Take

    Within our 744 Infrastructure stories, Sheffield has relatively few large-scale, city-core regeneration items, so the £860m Impact & Places Partnership signals the city moving into the same league as recent Manchester and Leeds brownfield programmes in terms of scale and complexity.

    Nearly £70m of government funding for land assembly and infrastructure against almost 1,200 homes at Furnace Hill and Neepsend implies a relatively infrastructure-heavy site, which contractors should read as a pipeline of enabling works (ground remediation, utilities, streets) ahead of vertical build-out.

    Capital&Centric’s fourth major project in Sheffield suggests the council is consolidating delivery with a small group of repeat developers, which typically shortens learning curves on local planning, heritage and ground conditions but can limit opportunities for new entrants to the city’s regeneration market.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 9 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 8 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.