Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Sandvik–JCHX global cooperation: underground fleet and project impacts for engineers

    February 12, 2026|

    Reviewed by Joe Ashwell

    Sandvik–JCHX global cooperation: underground fleet and project impacts for engineers

    First reported on International Mining – News

    30 Second Briefing

    Sandvik Group has signed a new global strategic cooperation agreement with Chinese contract mining major JCHX in Beijing, following a visit by Sandvik President and CEO Stefan Widing to JCHX’s headquarters on 11 February. JCHX Chairman Wang Xiancheng and Executive Vice President Wang Cicheng hosted the talks, where both parties agreed to expand the breadth and depth of their collaboration across underground mining equipment and services. The deal signals closer alignment between Sandvik’s OEM capabilities and JCHX’s large-scale contract mining projects in China and overseas.

    Technical Brief

    • Direct CEO–chairman level engagement signals intent to align long-term fleet planning and life-of-mine service models.
    • JCHX’s status as a contract miner implies bundled equipment–operation packages, affecting capex/opex split on client projects.

    Our Take

    Sandvik Group features in a relatively small subset of our 1,023 Mining stories, and where it does appear it is typically linked to long-term fleet or technology frameworks rather than one-off contract awards, suggesting this Beijing agreement with JCHX is likely structured around multi-project or multi-region collaboration.

    Among the 1,903 tag-matched ‘Projects’ and ‘Contract Award’ pieces, Chinese-based contractors like JCHX are increasingly visible as partners on overseas underground developments, so a global strategic cooperation with an OEM such as Sandvik could position JCHX more strongly for turnkey packages that bundle equipment, design and operations.

    With no specific commodities or mine sites named, this Sandvik–JCHX deal sits in the smaller group of framework-style items in our database that are not tied to a single asset, which usually means the commercial impact emerges gradually across multiple brownfield and greenfield projects rather than through a single headline award.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Global battery demand and Australian lithium: processing shift for mine engineers
    Mining
    42 minutes ago

    Global battery demand and Australian lithium: processing shift for mine engineers

    Surging global demand for lithium-ion batteries for electric vehicles and grid storage is pushing Australia to move beyond spodumene concentrate exports into domestic refining and cathode‑grade chemical production. Industry proposals centre on converting hard‑rock feed into battery‑grade lithium hydroxide and carbonate in Western Australia, leveraging existing Tier‑1 deposits and port infrastructure but facing high energy costs, skills shortages and permitting timelines. For miners and process engineers, the shift implies greater focus on impurity control, reagent optimisation and integration of hydrometallurgical circuits with upstream mine planning.

    Bengalla growth for New Hope: strip mine sequencing and design notes for planners
    Mining
    about 1 hour ago

    Bengalla growth for New Hope: strip mine sequencing and design notes for planners

    New Hope Group has lifted coal output across its Australian assets and is advancing growth plans at the Bengalla thermal coal mine in the Hunter Valley, where it holds an 80 per cent interest alongside Mitsui, Taipower and J-Power. The open-cut operation, which typically produces export-quality thermal coal for Asian power utilities via the Port of Newcastle, is the company’s key near-term expansion focus. For mine planners and geotechs, any Bengalla growth path will centre on additional strip mining, dragline and truck–shovel sequencing, and associated waste dump and haul road reconfiguration.

    Mining smarter with AI and data: edge network design notes for engineers
    Mining
    about 2 hours ago

    Mining smarter with AI and data: edge network design notes for engineers

    Australian miners are hitting a data wall as high‑bandwidth sensors, autonomous fleets and video streams overwhelm traditional cloud links, pushing operations towards private LTE networks and on‑site edge computing. Vendors such as Vocus are pairing Starlink Business Rural satellite backhaul with 4G/5G private LTE to keep haul trucks, crushers and fixed plant connected in real time, even on remote pits and waste dumps. For engineers, this shift means designing networks and control systems around low‑latency, on‑site processing for fleet dispatch, collision avoidance and condition monitoring rather than centralised data centres.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.