Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    RSK–Octavius acquisition: contracting shift and delivery risks for UK project teams

    November 24, 2025|

    Reviewed by Tom Sullivan

    RSK–Octavius acquisition: contracting shift and delivery risks for UK project teams

    First reported on The Construction Index

    30 Second Briefing

    RSK has acquired Octavius Infrastructure from Sullivan Street Partners, moving the formerly consultancy-focused group into tier one main contracting across UK rail and highways, with Octavius’ 700 staff retained under chief executive John Dowsett. Octavius reported £322.9m turnover and £8.6m pre-tax profit to 31 March 2025, while RSK turned over £2.24bn but remained loss-making after 11 acquisitions in the year. Current Octavius schemes include Ryde Pier and Waterloo Station roof refurbishments, new stations at Okehampton and Charfield, and the A46 Walsgrave and A140 Long Stratton Bypass upgrades.

    Technical Brief

    • Octavius originated as the rail and highways division of Geoffrey Osborne before its 2021 carve-out.
    • Leadership continuity is explicit: John Dowsett remains CEO, with Matt Smith and Gavin Pritchard heading rail and highways.
    • Year-on-year growth is strong, with Octavius turnover rising from £276.7m (2024) to £322.9m (2025).
    • Profitability has accelerated, with pre-tax profit increasing from £4.7m to £8.6m over the same period.
    • RSK’s group revenue reached £2,241m to 5 April 2025, driven by 11 acquisitions in that year alone.
    • Despite scale, RSK recorded a £124.5m pre-tax loss and has remained loss-making since 2017.

    Our Take

    Within our 32 Infrastructure stories, very few feature a UK contractor like RSK Group combining double‑digit revenue growth with a multi‑year loss‑making profile, which signals an aggressive roll‑up strategy where cash generation from assets such as Octavius is likely critical to stabilising the balance sheet.

    Octavius’ £300m‑plus turnover and 700‑strong workforce move RSK into the same competitive space as established tier one players on UK rail and highways frameworks, which could alter bidding dynamics on schemes similar in scale to the A46 Walsgrave and A140 Long Stratton upgrades.

    RSK’s 11 acquisitions in a single year stand out in our infrastructure database, suggesting integration risk will be a key execution issue; maintaining Octavius’ recent profitability will likely depend on how quickly RSK can align systems and governance without disrupting live projects such as the Ryde Pier and Colchester link road works.

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Cooling design for hyperscale data centres: water–energy trade-offs for engineers
    Infrastructure
    about 3 hours ago

    Cooling design for hyperscale data centres: water–energy trade-offs for engineers

    Cooling design for hyperscale data centres is becoming a critical constraint as AI workloads drive power densities well beyond traditional 5–10kW per rack, forcing operators to consider liquid cooling, rear-door heat exchangers and direct-to-chip systems. Engineers must balance evaporative and adiabatic cooling against tightening water-stress and abstraction limits, particularly in regions already facing summer drought restrictions. Site selection, pipework routing, thermal storage and integration with district heating networks are emerging as key civil and MEP interfaces, with planning authorities increasingly scrutinising water-use intensity alongside PUE.

    Southwark estate work resumes: delivery risks and completion notes for project teams
    Infrastructure
    about 4 hours ago

    Southwark estate work resumes: delivery risks and completion notes for project teams

    Work has restarted on two nearly complete residential blocks at Southwark’s St Saviours Estate in Bermondsey after ARJ Construction, which had finished about 90% of the works, went into administration in April 2024. Newly appointed contractor Bloom Construction, founded in 2023, is now tasked with delivering 40 council homes at the Fendall and Maltby site by spring 2026. The remaining scope covers final fit-out, M&E commissioning, contaminated soil removal, external works and landscaping, lift installation, play equipment and full building control compliance.

    £50m Bath residential scheme: enabling works and site risks for project teams
    Infrastructure
    about 4 hours ago

    £50m Bath residential scheme: enabling works and site risks for project teams

    Enabling works have started on Hartwell’s £50m regeneration of the 8.4-acre former Hartwells Garage site on Newbridge Road, Bath, including removal of the old damaged forecourt canopy and detailed pre-construction surveys. The Allford Hall Monaghan Morris-designed scheme will deliver 104 apartments, a 186-bed student block, new A1/A3 commercial units and landscaped public realm on the brownfield plot, vacated in 2019. Hartwell is working with Walsingham Planning, Ridge, Stantec, IMA Transport Planning and Aspect Ecology, with the main contractor still to be appointed.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy