Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Queensland resources power economy: royalty regime risk lens for mine planners

    December 18, 2025|

    Reviewed by Tom Sullivan

    Queensland resources power economy: royalty regime risk lens for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Queensland’s mid-year budget update shows resources royalties still underpin state finances, with coal, gas and metals revenue offsetting weaker coal prices and higher progressive royalty rates introduced in 2022. Treasury data points to sustained export volumes through ports such as Gladstone and Hay Point, with LNG, metallurgical coal and bauxite remaining key earners despite global price volatility. For miners, the figures signal continued fiscal reliance on high-value exports and reinforce the need to factor royalty regime risk into long-life project economics and expansion plans.

    Technical Brief

    • Treasury’s reliance on resource royalties increases fiscal pressure against granting future royalty holidays or project‑specific concessions.
    • For long‑life mining assets, Queensland fiscal settings now form a critical input to cut‑off grade optimisation.

    Our Take

    Queensland features heavily in our mining coverage, and pieces tagged to Gladstone Port often flag it as a bottleneck or enabler for bulk exports, so any drag from coal royalties will be weighed against the state’s reliance on this port for throughput and associated revenues.

    Across the 366 Mining stories in our database, Queensland is one of the few regions where fiscal settings and port capacity (notably at Gladstone Port) are repeatedly linked, suggesting operators there are unusually sensitive to how royalty changes flow through to logistics investment and maintenance budgets.

    With 723 tag-matched ‘Projects’ pieces, Queensland-focused items that mention Gladstone Port tend to coincide with expansion or debottlenecking studies, meaning any sustained royalty drag could delay timing for new bulk terminals or upgrades that miners are banking on for future volumes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MEGAMINES’ top 10 most capital intensive bulk mines: capex and risk notes for engineers
    Mining
    about 5 hours ago

    MEGAMINES’ top 10 most capital intensive bulk mines: capex and risk notes for engineers

    MEGAMINES ranks Saudi Arabia’s Wa’ad Al Shamal phosphate complex as the world’s costliest mining project, with total industrial-city investment of $22.7 billion and Ma’aden’s mine-and-refining CAPEX estimated at $15.5 billion, including an $8 billion original plant and a $7.7 billion Phosphate 3 expansion due by 2027. Guinea’s Simandou iron ore development follows with more than $20 billion in shared mine–rail–port spend, a 600 km trans-Guinean railway to a new deepwater port, and targeted output of 120 Mtpa of ~66% Fe ore by 2028. Brazil’s Serra Sul (S11D) at $19.5 billion plus a $2.8 billion brownfield expansion to 120 Mtpa, and Adani’s Carmichael coal project, originally scoped at 60 Mtpa with A$16.5–A$22 billion CAPEX but now operating at 10 Mtpa with a 200 km rail link, illustrate the scale, long timelines and redesign risk inherent in bulk mining megaprojects.

    Trilogy–South32 Arctic copper permit push: design and geotech notes for engineers
    Mining
    about 9 hours ago

    Trilogy–South32 Arctic copper permit push: design and geotech notes for engineers

    Trilogy Metals and South32’s 50/50 Ambler Metals JV has approved a $35 million 2026 work programme at Alaska’s Upper Kobuk Mineral Projects, targeting mine-permit submissions for the high-grade Arctic copper deposit under federal FAST-41. Drilling will focus on geotechnical and condemnation holes for mine design and infrastructure siting, while the Bornite camp is upgraded for multi-year geotechnical and exploration campaigns and an independent UKMP management team is re-established. Arctic’s 2023 feasibility study outlines a 13-year operation producing 149 Mlb/y copper plus zinc, lead, gold and silver, with an after-tax NPV8 of $1.1 billion and 22.8% IRR.

    Almonty’s Sangdong tungsten mine: commercial start and stoping plan notes for engineers
    Mining
    about 10 hours ago

    Almonty’s Sangdong tungsten mine: commercial start and stoping plan notes for engineers

    Almonty Industries has begun commercial mining at the Sangdong tungsten mine in Yeongwol, Gangwon Province, with the first truckload of ore delivered to the run-of-mine (ROM) pad, signalling the shift from development to active extraction. The project is centred on redeveloping one of the world’s historically significant tungsten deposits, aiming to supply high-grade ore into Asian and global hardmetal and alloy markets. For mine planners and geotechnical teams, the move commits the site to full-scale stoping, ground support, and backfill sequencing rather than purely development headings.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.