Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Nova Andino Litio implementation: design and schedule notes for lithium project teams

    December 29, 2025|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Nova Andino Litio SpA, the new joint venture between Codelco and SQM to develop lithium production in Chile’s Atacama Salt Flat, has held its first board meeting, signalling a shift from negotiation to implementation. The board comprises Codelco representatives Máximo Pacheco M, Josefina Montenegro A and Alfredo Moreno Ch, alongside SQM’s Ricardo Ramos. For project engineers, this formal governance structure clears the way for detailed planning of brine extraction, evaporation pond layouts and processing capacity expansions in one of the world’s highest-grade lithium salars.

    Technical Brief

    • Decision-making structure should streamline permitting packages for brine fields, evaporation ponds and processing facilities.
    • Integration of Codelco copper operations knowledge may influence shared infrastructure: power, water supply and haul roads.
    • For other Chilean salars, this JV model could become the reference template for future lithium contracts.

    Our Take

    Codelco’s role in this lithium JV at the Atacama Salt Flat comes as our database also shows it pushing hard on copper growth and automation partnerships (e.g. the recent Hexagon MoU), signalling a broader pivot to technology-heavy, state-led resource development in Chile.

    Among recent Chile-focused pieces in our mining coverage, most Codelco items centre on copper capex and productivity, so its presence in a lithium JV marks a concrete implementation step of the ‘expanded state role in lithium’ flagged in the December 14 presidential runoff analysis.

    With lithium now appearing alongside copper and cobalt in Chile political coverage in our database, a JV structure at Atacama suggests future projects may increasingly need to align with both state ownership expectations and evolving national strategies for battery metals supply security.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Silver price’s steepest fall since 2021: planning signals for mine projects
    Mining
    about 13 hours ago

    Silver price’s steepest fall since 2021: planning signals for mine projects

    Silver plunged nearly 10% from a record $83.63/oz to the low $70s on Monday, its steepest intraday fall since 2021, after a month-long 40% surge driven by Chinese investment demand and Shanghai spot premiums exceeding $8/oz over London. Despite the pullback, silver is still up 148% in 2025 and briefly reached a market capitalisation above Nvidia’s $4.55 trillion, with its 14-day RSI easing to about 67 after three weeks above the overbought 70 threshold. Gold also retreated more than 4.5% from a record $4,543.51/oz, though it remains up nearly 75% year to date.

    Copper price plunges in New York: supply, tariffs and demand risks for mine planners
    Mining
    about 16 hours ago

    Copper price plunges in New York: supply, tariffs and demand risks for mine planners

    Copper prices briefly surged towards $13,000/t on the LME on Monday, with a 6.6% intraday jump, while CME March futures in New York swung from a $5.92/lb peak to $5.56/lb, a 6% plunge that erased Friday’s gains. The metal is up about 35% in 2025 as US tariff fears on copper under President Trump drive front‑loaded imports, even as Chinese demand softens and mine disruptions at Grasberg, Kamoa‑Kakula and El Teniente constrain supply. BloombergNEF projects energy‑transition demand could triple by 2045, risking market deficits from 2026 and potential shortages of up to 19 Mt by 2050 without major new projects and recycling.

    Axis $29bn Guinea bauxite claim: licence security lessons for mine teams
    Mining
    about 17 hours ago

    Axis $29bn Guinea bauxite claim: licence security lessons for mine teams

    Axis International has launched a $28.9 billion arbitration claim at the World Bank’s ICSID after Guinea revoked the Boffa bauxite mining permit, one of more than 50 licences cancelled in May under President Mamadi Doumbouya’s crackdown on non-compliant projects. Axis says its Axis Minerals Resources unit, 85%-owned by Axis with the state holding 15%, exported 18 million tonnes of bauxite in 2024 from Boffa and was targeting 48 million tonnes in 2025, backed by over 800 million tonnes of proven reserves. The government has also seized equipment, frozen bank accounts and cancelled other operators’ permits, including Nomad Bauxite Corporation and a subsidiary of Emirates Global Aluminium, signalling heightened sovereign and licence security risk in Guinea’s bauxite and iron ore sectors.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.