Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Northern Star’s productivity drive: mine planning and cost lessons for engineers

    January 22, 2026|

    Reviewed by Tom Sullivan

    Northern Star’s productivity drive: mine planning and cost lessons for engineers

    First reported on Australian Mining

    30 Second Briefing

    Northern Star Resources is tightening cost discipline and targeting higher productivity across its Australian gold portfolio after a “challenging” period, with particular emphasis on its Kalgoorlie and Yandal operations and integration of the KCGM Super Pit. The company is pushing mine-planning optimisation, fleet efficiency and mill throughput improvements at processing hubs such as Kanowna Belle and Thunderbox, while scrutinising unit costs per ounce. For contractors and suppliers, the shift signals closer attention to drilling productivity, equipment utilisation and ore-handling performance benchmarks on existing brownfield sites.

    Technical Brief

    • Northern Star flagged “a challenging period” driven by inflationary pressures and labour market tightness across Australia.

    Our Take

    Northern Star’s work around the Lady Herial gold deposit fits with the strong brownfield expansion pattern highlighted in the University of Queensland study in our database, where gold is one of several commodities seeing capital channelled into existing camps rather than new greenfield builds.

    Within our 716 Mining stories and 1363 Projects‑tagged pieces, Australia‑based gold items like this one often emphasise productivity and orebody knowledge upgrades, signalling that operators such as Northern Star are trying to lift margins without relying on major new discoveries.

    The 90‑day negotiation period between Lunnon Metals and St Ives underscores how tenure and access arrangements in mature Australian gold belts can be as time‑critical to productivity gains as plant upgrades, especially when companies are trying to sequence ore from multiple small deposits into shared infrastructure.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    24 minutes ago

    Osisko–JDS Cariboo gold build: execution and EPCM takeaways for mine engineers

    Osisko Development’s Barkerville Gold Mines has signed a definitive project and construction management services agreement with JDS Energy & Mining to build the Cariboo underground gold project in British Columbia. A feasibility study completed in April 2025 outlines a “robust and scalable” underground mine, with JDS to coordinate detailed engineering, procurement and construction management across the processing plant, underground infrastructure and surface facilities. The deal signals progression from study to execution, with geotechnical design, underground access development and shaft/decline construction planning now moving onto a defined EPCM footing.

    TOMRA Mining waste sorting: design and value notes for mine project teams
    Mining
    24 minutes ago

    TOMRA Mining waste sorting: design and value notes for mine project teams

    TOMRA Mining is deploying advanced sensor-based ore sorting to convert mine waste rock and tailings into saleable aggregate for infrastructure, extending mine life and reducing primary crushing and haulage demands. By separating barren from mineralised material on conveyors using XRT and other sensors, operations can upgrade run-of-mine feed, cut energy and water use in downstream comminution, and divert clean fractions for construction uses. The approach opens a secondary revenue stream while lowering waste dump volumes and long-term rehabilitation liabilities.

    Mining
    about 4 hours ago

    Sandvik drill bit resharpening expansion: safety and productivity notes for mines

    Sandvik is adding the mid-range RG550Be drill bit resharpening machine to its portfolio, extending coverage across both top hammer (TH) and down-the-hole (DTH) drilling with a tiered line-up of high-end, mid-range and handheld units. The OEM is targeting improved safety and ergonomics in bit maintenance, moving more grinding work off manual benches and into enclosed, purpose-built machines. For mine operators, the broader range allows closer matching of resharpening capacity to fleet size and bit type, with potential gains in bit life and drilling penetration rates.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.