Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Northern Star’s productivity drive: mine planning and cost lessons for engineers

    January 23, 2026|

    Reviewed by Tom Sullivan

    Northern Star’s productivity drive: mine planning and cost lessons for engineers

    First reported on Australian Mining

    30 Second Briefing

    Northern Star Resources is tightening cost discipline and targeting higher productivity across its Australian gold portfolio after a “challenging” period, with particular emphasis on its Kalgoorlie and Yandal operations and integration of the KCGM Super Pit. The company is pushing mine-planning optimisation, fleet efficiency and mill throughput improvements at processing hubs such as Kanowna Belle and Thunderbox, while scrutinising unit costs per ounce. For contractors and suppliers, the shift signals closer attention to drilling productivity, equipment utilisation and ore-handling performance benchmarks on existing brownfield sites.

    Technical Brief

    • Northern Star flagged “a challenging period” driven by inflationary pressures and labour market tightness across Australia.

    Our Take

    Northern Star’s work around the Lady Herial gold deposit fits with the strong brownfield expansion pattern highlighted in the University of Queensland study in our database, where gold is one of several commodities seeing capital channelled into existing camps rather than new greenfield builds.

    Within our 716 Mining stories and 1363 Projects‑tagged pieces, Australia‑based gold items like this one often emphasise productivity and orebody knowledge upgrades, signalling that operators such as Northern Star are trying to lift margins without relying on major new discoveries.

    The 90‑day negotiation period between Lunnon Metals and St Ives underscores how tenure and access arrangements in mature Australian gold belts can be as time‑critical to productivity gains as plant upgrades, especially when companies are trying to sequence ore from multiple small deposits into shared infrastructure.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Vulcan Elements–North Carolina rare earth magnets: design and supply notes for engineers
    Mining
    about 7 hours ago

    Vulcan Elements–North Carolina rare earth magnets: design and supply notes for engineers

    Vulcan Elements has partnered with the North Carolina Collaboratory and UNC-Chapel Hill chemist Yosuke Kanai to use quantum-mechanical simulations to predict how atomic-level changes affect rare earth magnet properties, backed by a $600,000 research award. The work feeds directly into Vulcan’s 1.1 million-square-foot Benson, North Carolina plant, designed for 10,000 t/y of magnet production and billed as the largest rare earth magnet factory outside China. Vulcan claims its material, technology, software, IP and ownership are fully decoupled from Chinese supply chains, aligning with its existing $1.4 billion US government-backed partnership with ReElement Technologies.

    Northern Star KCGM expansion: commissioning timeline and capacity cues for engineers
    Mining
    about 6 hours ago

    Northern Star KCGM expansion: commissioning timeline and capacity cues for engineers

    Northern Star Resources has completed the tie-in of its expanded KCGM processing plant in Western Australia, with commissioning of the integrated circuit now under way ahead of a planned production ramp-up in the second half of FY27. Early commissioning is focused on achieving stable, sustained operating conditions across the enlarged plant, rather than immediate throughput gains. For plant and process engineers, the timeline signals when additional milling, crushing and gold recovery capacity at KCGM is expected to start contributing materially to output and unit cost performance.

    Regis Resources and McPhillamys: funding optionality and schedule signals for engineers
    Mining
    about 6 hours ago

    Regis Resources and McPhillamys: funding optionality and schedule signals for engineers

    Regis Resources ended the September quarter with $1.28 billion in cash and bullion after generating $265 million in operating cash flow and collecting a $51 million break fee from Vault Minerals, following its decision not to match Genesis Minerals’ competing offer. The strengthened balance sheet gives Regis substantial optionality on funding the McPhillamys gold project in New South Wales, rather than relying heavily on project finance or equity. For mine planners and project engineers, this signals potential acceleration of McPhillamys approvals, early works and long-lead procurement once a final investment decision is made.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental