Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Nevada King–Centerra 9.9% stake: project and drilling lens for mine planners

    March 24, 2026|

    Reviewed by Joe Ashwell

    Nevada King–Centerra 9.9% stake: project and drilling lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Nevada King Gold’s share price jumped 24% to C$0.205 after Centerra Gold agreed to invest C$10 million at C$0.21 per share for a 9.9% stake as part of a C$16 million financing, valuing Nevada King at about C$87 million. Proceeds will accelerate drilling and exploration at the past-producing Atlanta open-pit project on Nevada’s Battle Mountain trend, where a 2025 resource estimate outlines 27.7 million tonnes at 1.14 g/t Au (about 1 million oz) and follows more than 100,000 metres of drilling over a 130 sq. km land package. An investor rights agreement will give Centerra participation and information rights, signalling closer technical involvement alongside its existing Goldfield and Liberty Gold (Black Pine) positions in the region.

    Technical Brief

    • Centerra will close the C$10 million equity investment in Q2, providing near-term drilling liquidity.
    • Nevada King’s chairman Collin Kettell and major shareholder Michael Parker will jointly contribute ~C$6 million to the raise.
    • An investor rights agreement grants Centerra participation in future financings and enhanced technical-information access.
    • Atlanta’s 2025 resource tonnage has more than doubled versus the 2020 estimate, indicating rapid model growth.
    • Recent exploration has pivoted from infill to step-out drilling on satellite targets around the core Atlanta zone.
    • Key satellite targets include Atlanta South, Atlanta North along the West Atlanta Fault, Silver Park East and Western Rim.
    • Over 100,000 m of drilling has been completed across the 130 sq. km Atlanta land package to date.
    • Nevada King also controls additional Nevada exploration properties, notably Lewis and Horse Mountain, offering regional pipeline optionality.
    • Centerra’s parallel positions at Goldfield (Nevada) and Liberty Gold’s Black Pine (Idaho) create a multi-asset Great Basin oxide-gold cluster.

    Our Take

    Centerra Gold’s move to a 9.9% equity position in Nevada King mirrors other recent strategic minority stakes in our database, such as AngloGold Ashanti’s 5% in Thesis Gold, signalling that mid-tiers are increasingly using small, option-like positions to secure exposure to North American gold projects without committing to full acquisitions.

    Centerra’s parallel work advancing Kemess and extending Mount Milligan in British Columbia suggests it is building a pipeline that balances established copper-gold production in Canada with earlier-stage gold optionality in the United States, which may influence how aggressively it seeks future project-level rights or offtake around Atlanta.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Top 50 mining companies add $250bn in 2026: capital and project signals for engineers
    Mining
    about 4 hours ago

    Top 50 mining companies add $250bn in 2026: capital and project signals for engineers

    Global mining majors added $250 billion in value in early 2026, lifting the MINING.COM Top 50 to a combined $2.41 trillion despite the US–Iran war and volatile gold at about $4,700/oz and silver above $70/oz, both off record spikes. BHP briefly exceeded a $200 billion market capitalisation, copper contributed $7.95 billion to its half‑year operating earnings, and six miners – including Agnico Eagle, Zijin Mining, Southern Copper and Newmont – now sit in the $100‑billion club. At the other end, Amman Minerals fell 27% on Indonesian smelter delays and Ivanhoe Mines cut Kamoa‑Kakula 2026 copper guidance to 290,000–330,000 tonnes, dropping it below the $18 billion Top 50 cut‑off.

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners
    Mining
    1 day ago

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners

    Canadian processor pH7 Technologies is expanding its Vancouver facility, backed by up to C$4 million from NRC IRAP, to scale its organo-electrochemical platform that recovers platinum, palladium and rhodium from secondary materials without toxic reagents or tailings wastewater. The commercial plant already processes spent catalytic converters, producing 30,000–40,000 oz of platinum-equivalent PGMs per year under a tolling and offtake model involving partners such as Mitsubishi. pH7 is now piloting electrochemically generated oxidants to heap leach chalcopyrite and other sulphide ores without cyanide, targeting on-site mine deployment within 1–2 years across South America, Africa and Australia.

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers
    Mining
    1 day ago

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers

    Dellner Bubenzer is supplying a wide range of industrial brakes and couplings for mining hoists, slewing drives and belt conveyors, developed in long-term collaboration with OEMs. The company focuses on both service and emergency braking solutions tailored to heavy-duty mining duty cycles and harsh environments, addressing controlled hoisting, precise slewing and high-tension conveyor stopping. For engineers, the key point is an integrated approach to drivetrain and braking design, rather than bolt-on safety systems, across multiple critical mining applications.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.