Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    National Apprenticeship Week: routes into UK civil engineering for project teams

    February 10, 2026|

    Reviewed by Joe Ashwell

    National Apprenticeship Week: routes into UK civil engineering for project teams

    First reported on New Civil Engineer

    30 Second Briefing

    Engineering and construction firms are using National Apprenticeship Week (9–15 February) to promote structured routes into civil engineering, with contractors, consultants and public-sector clients jointly publicising apprenticeship intakes and training pathways. Initiatives centre on Level 3–6 civil engineering and technician apprenticeships aligned to ICE and IStructE routes, combining site-based experience on live infrastructure projects with day-release or block-release study at FE colleges and universities. Employers are stressing early exposure to design offices, digital tools such as BIM, and geotechnical and structures rotations to address skills gaps on major UK transport and water schemes.

    Technical Brief

    • Contractors, consultants and public-sector clients are coordinating messaging, improving consistency of safety culture from office to site.
    • Joint promotion across the supply chain supports common induction content on CDM duties and site safety expectations.
    • Client involvement in apprenticeship campaigns encourages early exposure to asset-owner safety requirements and permit-to-work systems.
    • Cross-organisation initiatives facilitate standardised toolbox talks and RAMS briefings for apprentices on multi-contractor projects.
    • Sector-wide focus during the week provides a defined window to schedule safety stand-downs and refresher training.
    • Public celebration of apprenticeships helps normalise reporting of near-misses and safety concerns by junior staff.
    • Similar coordinated campaigns could be used to roll out new safety standards or digital permit systems nationally.

    Our Take

    Within the 675 Infrastructure stories in our database, UK-focused pieces that touch on workforce pipelines and skills are relatively sparse compared with asset-delivery coverage, suggesting National Apprenticeship Week is becoming a key focal point for discussing long-term capacity rather than specific projects.

    For safety-tagged infrastructure content, most recent UK items centre on site incidents or regulatory changes, so linking apprenticeships to Safety indicates operators are explicitly framing early-career training as a frontline control for reducing incident rates rather than a purely HR initiative.

    Given the UK setting, this kind of apprenticeship emphasis typically aligns with major client requirements on social value and local employment in project tenders, meaning firms that visibly engage with National Apprenticeship Week can strengthen their position in competitive framework bids.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 10 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 9 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy