Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Mt Milligan expansion approval to 2035: design and risk notes for mine engineers

    January 7, 2026|

    Reviewed by Joe Ashwell

    Mt Milligan expansion approval to 2035: design and risk notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    British Columbia’s Environmental Assessment Office has approved an amendment to Centerra Gold’s Mt Milligan copper-gold mine certificate, allowing increased production and extending operations near Fort St James to 2035. The decision by the Chief Executive Assessment Officer follows a detailed review of the EAO’s assessment report and associated conditions. Longer mine life and higher throughput will drive updates to waste rock and tailings management plans, water balance and discharge controls, and closure design for the open-pit operation.

    Technical Brief

    • Amendment modifies Mt Milligan’s existing environmental assessment certificate rather than issuing a new approval.
    • Decision was taken by the EAO’s Chief Executive Assessment Officer, not a political appointee.
    • EAO relied on a formal assessment report with project-specific conditions attached to the amended certificate.
    • Conditions are expected to tighten operational controls on waste rock placement and tailings facility operation.
    • Water balance modelling and discharge criteria become binding compliance points under the amended certificate conditions.
    • Closure and reclamation concepts now need re-optimising to reflect the longer open-pit operating horizon.

    Our Take

    Extending Mt Milligan’s copper-gold operation in British Columbia to 2035 aligns with several other long-life copper items in our database, signalling that regulators in established jurisdictions are still prepared to back incremental brownfield expansions over greenfield builds.

    The related piece noting an 11% throughput uplift at Mount Milligan suggests Centerra Gold is prioritising debottlenecking and mill efficiency, which typically lowers unit costs and can improve competitiveness against other North American copper-gold producers in our coverage.

    Within the 250 copper- and gold-keyword pieces in our database, British Columbia projects like Mt Milligan and Gibraltar frequently feature in permitting and expansion stories, indicating the province remains a core jurisdiction for sustaining North American copper supply into the 2030s.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Scope Systems cyber attack: resilience and risk lessons for mining IT teams
    Mining
    1 day ago

    Scope Systems cyber attack: resilience and risk lessons for mining IT teams

    A ransomware attack on Perth-based Scope Systems’ Pronto Xi ERP cloud stack disrupted dozens of mining customers, including Northern Star Resources and Evolution Mining, in what MM‑ISAC’s Rob Labbe calls the broadest single third‑party cyber event the sector has seen. Scope says client servers were restored from backups and not directly accessed, but admits internal data was exfiltrated and has not disclosed the attack vector, raising questions about visibility at hypervisor, storage and backup layers. The incident spotlights how multi‑tenant vCenter/ESXi environments, VM cloning and snapshot abuse—already used by groups like Akira—could expose integrated exploration, production and maintenance data across more than 400 Pronto Xi‑reliant mining operations.

    Newmont’s Red Chris underground expansion: block cave design and capex notes for engineers
    Mining
    1 day ago

    Newmont’s Red Chris underground expansion: block cave design and capex notes for engineers

    Newmont’s Red Chris mine in British Columbia has secured an amended Environmental Assessment Certificate and Mines Act permit, allowing a shift from open-pit to underground block caving and extending operations into the mid-2040s. The copper-gold porphyry deposit in the Golden Triangle hosts an estimated 20 million oz of gold and 13 billion lb of copper, with the block cave expected to lift Canada’s copper output by about 15%. The project entails several billion dollars in capital, around 1,800 construction jobs and roughly 1,500 operating roles at peak.

    Goldman cuts gold price forecast to US$4,900: planning notes for mine projects
    Mining
    1 day ago

    Goldman cuts gold price forecast to US$4,900: planning notes for mine projects

    Goldman Sachs has cut its end‑2026 gold price forecast by US$500/oz to US$4,900/oz after the US Federal Reserve, under new chair Kevin Warsh, signalled a hawkish shift that has pushed market-implied December rate hike odds to 87%. Spot gold has already fallen to about US$4,100/oz, down 27% from its near‑US$5,600/oz January peak, with three consecutive monthly losses between March and May and a 4% year‑to‑date decline. Goldman warns a 2026 year‑end target as low as US$4,400/oz is possible if rates rise, partly offset by ongoing central‑bank buying of roughly 50 tonnes/month this year and 40 tonnes/month next year.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy