Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    MAX Power Mining’s new natural hydrogen target: subsurface insights for project teams

    January 31, 2026|

    Reviewed by Tom Sullivan

    MAX Power Mining’s new natural hydrogen target: subsurface insights for project teams

    First reported on MINING.com

    30 Second Briefing

    MAX Power Mining has defined a new natural hydrogen drilling target at the Bracken prospect on the Saskatchewan–Montana border, complementing its confirmed Lawson discovery on the 475 km-long Genesis Trend. The Bracken well, planned to spud in February pending licensing, sits within the 75 km-wide Grasslands project and was sited using 34.3 line-km of proprietary 2D seismic integrated with legacy seismic to map basement architecture, structural pathways and migration corridors. MAX Power aims to use Bracken as a calibration point to test basin-scale continuity and repeatable, scalable natural hydrogen systems that may also host helium.

    Technical Brief

    • Lawson natural hydrogen discovery is undergoing analytical testing, resource modelling and formal resource estimation in parallel.
    • MAX Power is targeting February spud for Bracken, contingent on completion of Saskatchewan licensing.
    • Grasslands project covers a 75 km-wide permitted corridor, giving room for multiple step-out wells.
    • Bracken is described as a second “play concept”, distinct from the Lawson Genesis Trend system.
    • Integrated workflow combined 34.3 line‑km of new proprietary 2D seismic with legacy 2D seismic coverage.
    • Interpretation focused on basement architecture, structural/stratigraphic pathways and migration corridors for hydrogen and “clean gas”.
    • Grasslands, like Genesis, is considered prospective for co‑occurring helium with natural hydrogen accumulations.
    • CEO emphasises “months to molecules” timelines, contrasting natural hydrogen commercialisation speed with conventional mineral/metal projects.

    Our Take

    Natural hydrogen appears only sporadically in our 820 Mining stories, so MAX Power Mining’s Lawson and Grasslands work in Saskatchewan positions Canada alongside a small group of early-mover jurisdictions experimenting with dedicated H2 exploration rather than incidental gas finds.

    The 475 km Genesis Trend and 75 km-wide Grasslands project imply a basin-scale play concept; if even modest accumulations are confirmed, this could favour portfolio-style exploration strategies more akin to helium and conventional gas than to typical hard‑rock mining projects in Saskatchewan.

    With helium also listed as a target commodity, MAX Power’s Saskatchewan focus mirrors other helium–hydrogen dual plays in our database, suggesting that operators see shared subsurface risk and infrastructure synergies that can improve exploration economics for both gases.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 4 hours ago

    Anglo Asian–Worley Xarxar, Garadag studies: capex and layout insights for mine planners

    Anglo Asian Mining has appointed Worley Europe Limited to deliver full feasibility studies for its Xarxar and Garadag copper-gold projects in Azerbaijan, moving both assets towards potential development decisions. Worley, part of Australia-headquartered Worley Group, will apply its global open-pit and processing-plant design capability to define mine layouts, metallurgical flowsheets and infrastructure requirements. The work is expected to firm up capital and operating cost estimates and clarify options for staged development and shared infrastructure across the two deposits.

    Mining
    about 4 hours ago

    Veracio–Bureau Veritas Latin America rollout: drill-to-model gains for mine teams

    Veracio and Bureau Veritas have signed an MoU to roll out Veracio’s advanced geological scanning technologies across Chile, Peru, Argentina and Brazil, with scope to extend into other Latin American markets. The collaboration is expected to pair Veracio’s digital core scanning and downhole sensing tools with Bureau Veritas’ regional laboratory and inspection network to speed up geological data acquisition and QA/QC. For miners, this could tighten drill-to-model cycles, improve orebody characterisation and standardise high-resolution geoscientific datasets across multiple operations.

    Mining
    about 4 hours ago

    Sandvik–Diemme Filtration deal: integrated dewatering flowsheets for mine designers

    Sandvik has agreed to acquire Italy-based Diemme Filtration, adding high-performance mining filter presses and dewatering systems as a new Filtration division within its Rock Processing business area. Diemme’s portfolio includes large automated filter presses for tailings and concentrate dewatering, targeting dry-stack tailings and reduced process water consumption in large concentrators. The move gives Sandvik an in-house solution for integrating crushing, screening and filtration flowsheets, with potential implications for tailings storage design and water balance in brownfield and greenfield plants.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy