Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Kinross Phase X, Curlew and Redbird 2: mine-life and cost lens for planners

    January 15, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Kinross Gold Corporation will advance three US organic growth projects: Round Mountain Phase X and Bald Mountain Redbird 2 in Nevada, plus the Kettle River-Curlew underground project in Washington. The developments target mine-life extensions at existing operations rather than new greenfield builds, leveraging established processing plants, haul roads and permitting frameworks. Kinross expects the projects to lower long-term unit costs across its US portfolio, with particular focus on optimising strip ratios and sustaining grades in Nevada while reactivating high-margin underground feed at Kettle River-Curlew.

    Technical Brief

    • For similar brownfield mining expansions, the approach illustrates value in re-using permits and infrastructure.

    Our Take

    Kinross Gold Corporation features in only a small subset of the 635 Mining stories in our database, so advancing Round Mountain Phase X, Bald Mountain Redbird 2 and Kettle River-Curlew together signals a relatively concentrated push on US brownfield growth rather than greenfield diversification.

    With two of the three projects in Nevada, this move reinforces that state’s position in our Projects-tagged coverage as a core jurisdiction for incremental mine-life extensions, where permitting pathways and existing infrastructure tend to favour phased expansions over new-builds.

    Restarting or extending activity at Kettle River-Curlew in Washington, alongside the Nevada work, likely helps Kinross balance jurisdictional risk within the United States while leveraging sunk infrastructure, a pattern seen across several North American Projects-tagged items in our database.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Magmatic’s Myall diamond drilling: design and resource implications for mine planners
    Mining
    about 3 hours ago

    Magmatic’s Myall diamond drilling: design and resource implications for mine planners

    Exploration activity across Australia’s resources sector this week includes Magmatic Resources commencing diamond drilling at its Myall copper–gold project in New South Wales, targeting deeper porphyry-style mineralisation beneath previous RC intercepts. Parallel campaigns involve new drill programmes and project development steps at multiple sites, signalling continued spend on brownfield extensions and greenfield targets despite cost pressures. Geotechs and mine planners should watch for updated resource models and potential shifts in pit-shells or underground designs as deeper porphyry and structurally controlled zones are tested.

    Golden Pole high-grade boosts Waihi: design and scheduling notes for mine planners
    Mining
    about 3 hours ago

    Golden Pole high-grade boosts Waihi: design and scheduling notes for mine planners

    High-grade gold intercepts from Ora Banda Mining’s Golden Pole deposit are boosting the underground potential of the Waihi project near Kalgoorlie, with targeted follow-up drilling extending mineralisation along strike and at depth. The company is focusing on narrow, high-grade lodes accessible from existing underground development, aiming to convert recent hits into JORC-compliant resources and near-term ore feed for the Davyhurst processing plant. For geotechs and mine planners, the results point to deeper stoping fronts, tighter ground control requirements and potential schedule changes for underground access development.

    Austral–Glencore Lady Loretta copper deal: planning and geotechnical notes for mines
    Mining
    about 4 hours ago

    Austral–Glencore Lady Loretta copper deal: planning and geotechnical notes for mines

    Austral Resources has agreed to acquire Glencore AG’s Lady Loretta underground copper mine in north-west Queensland, adding a high-grade sulphide operation to its existing heap leach–SX/EW oxide business at Anthill. The Lady Loretta asset, previously a major zinc–lead–silver producer near Mount Isa, includes established underground workings, a decline, ventilation infrastructure and a permitted mining lease, giving Austral a second ore source within trucking distance of regional concentrators. The deal signals a shift towards a mixed oxide–sulphide portfolio, with implications for new concentrator offtake, mine planning and geotechnical management of deeper stopes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.