Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Product
    Projects

    Keeping mines pumping with Truflo: dewatering design notes for site engineers

    March 9, 2026|

    Reviewed by Joe Ashwell

    Keeping mines pumping with Truflo: dewatering design notes for site engineers

    First reported on Australian Mining

    30 Second Briefing

    Truflo Pumps, founded as a family agricultural pump service in regional New South Wales, has grown into a specialist supplier of high-capacity dewatering and slurry pumps for Australian mines. The company manufactures modular skid- and trailer-mounted units with wet-end stock tailored for abrasive mine water, and deploys diesel- and electric-driven pumpsets for pit dewatering, underground sumps and tailings transfer. For operators, the focus is on rapid mobilisation, standardised spares and robust materials selection to keep pits accessible and haul roads dry during high-rainfall events.

    Technical Brief

    • Wet-end stock is pre-built in multiple impeller diameters and metallurgy combinations for rapid pump assembly.
    • Modular wet ends allow mines to swap casings and impellers without changing base frames or drives.
    • Abrasion-resistant wet ends are selected specifically for dirty mine water with suspended fines and coarse solids.
    • Standardised wet-end geometries simplify hydraulic performance prediction and spares planning across multiple mine sites.
    • Wet-end modularity reduces the number of complete spare pumps required in mine dewatering fleets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Rare Earths Americas IPO: project pipeline and funding priorities for mine planners
    Mining
    about 4 hours ago

    Rare Earths Americas IPO: project pipeline and funding priorities for mine planners

    Rare Earths Americas has filed an SEC registration statement for an underwritten IPO on NYSE American under ticker “REA”, targeting heavy rare earths projects in the US and Brazil, with Cantor as lead bookrunner and Stifel as bookrunner alongside Canaccord Genuity and B. Riley Securities as co-managers. Proceeds are earmarked for land acquisition, drilling, metallurgical test work, permitting and SK-1300 technical report preparation at the Shiloh project in Georgia. Additional funds will support exploration, land consolidation, metallurgy, engineering and permitting at the Alpha and Constellation projects in Bahia and Minas Gerais, plus early-stage work at Homer and Liberty Peak.

    Almonty Industries’ US move and Gentung restart: supply chain notes for mine planners
    Mining
    about 6 hours ago

    Almonty Industries’ US move and Gentung restart: supply chain notes for mine planners

    Global tungsten producer Almonty Industries has shifted its corporate headquarters from Toronto to Dillon, Montana, aligning its base with the recently acquired Gentung-Browns Lake tungsten project, a former Union Carbide operation with existing water rights and pipework. The company, which restarted the Sangdong mine in South Korea in March after a 30-year hiatus to supply US markets, plans to recommence Gentung production as early as late 2026 using reconditioned plant from its Spanish operations, pending an extraction permit. The move follows a $90 million oversubscribed Nasdaq IPO and a $129 million follow-on financing, signalling a push to build a US-aligned tungsten supply chain outside China.

    Omai resource update in Guyana: mine planning and PEA takeaways for engineers
    Mining
    about 6 hours ago

    Omai resource update in Guyana: mine planning and PEA takeaways for engineers

    Omai Gold Mines has increased total resources at its past-producing Omai project in central Guyana to 8 million oz., up from 6.5 million oz., with indicated resources now 38.1 million tonnes at 2.04 g/t and inferred 106.6 million tonnes at 1.59 g/t, after 18,000 metres of drilling and updated modelling. The Wenot open-pit deposit now holds about 1.45 million oz. indicated at 1.59 g/t and 3.9 million oz. inferred at 1.33 g/t, while the Gilt Creek underground resource has grown to roughly 2.5 million oz. at 3.26 g/t. A new PEA due within three months is expected to evaluate a combined open-pit/underground operation targeting 250,000–300,000 oz. per year with a larger mill, ahead of a planned prefeasibility study and 50,000-metre drill campaign.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.