Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Ioneer partner search to H1 2026: Rhyolite Ridge economics for mine planners

    December 20, 2025|

    Reviewed by Joe Ashwell

    Ioneer partner search to H1 2026: Rhyolite Ridge economics for mine planners

    First reported on MINING.com

    30 Second Briefing

    Ioneer now expects to secure a new partner for its Rhyolite Ridge lithium-boron project in Nevada in H1 2026, after Sibanye-Stillwater withdrew from a proposed $490 million, 50% stake and Goldman Sachs-advised talks overran the original four‑month timetable amid weaker markets and geopolitical uncertainty. Backed by a $996 million US government loan and all key permits, Rhyolite Ridge has an updated DFS with a 95‑year mine life, NPV lifted to $1.5 billion, and reserves of 7.8 Mt boric acid plus 2 Mt lithium carbonate supporting an initial 77‑year plan. Average output for years 1–25 is now projected at 24,500 t/y lithium carbonate equivalent and 135,500 t/y boric acid, placing the operation in the global lowest cost quartile on an LCE basis and making co‑product economics central to any JV valuation.

    Technical Brief

    • Ioneer now targets selling a smaller 40% project stake in any new partnership.
    • Sibanye-Stillwater had previously proposed $490 million for a 50% interest before exiting in February 2025.
    • Goldman Sachs is running the formal strategic partnering process, which has already exceeded the initial four‑month window.
    • Rhyolite Ridge is located 362 km north of Las Vegas, in Nevada’s arid interior basin.
    • Over 70% of engineering design is reportedly complete, indicating limited remaining front-end design risk.
    • All key permits are already in place, reducing schedule exposure to lengthy US federal approvals.
    • Ioneer has been advancing Rhyolite Ridge since 2016, giving nearly a decade of site-specific data and studies.
    • Parallel interest in acquiring Rio Tinto’s US boron assets (c. $2 billion valuation) suggests a deliberate boron growth strategy beyond Rhyolite Ridge.

    Our Take

    With a 95‑year projected mine life and combined reserves of 7.8 Mt boric acid and 2 Mt lithium carbonate, Rhyolite Ridge in Nevada would give any incoming partner unusually long-duration exposure to US-based critical minerals, which is rare among the battery metals projects in our database that are often modelled on 15–30 year lives.

    The US government’s US$996 million loan support materially de-risks country and financing risk for ioneer relative to many other lithium projects in our Mining/Projects coverage, which could justify a lower cost of capital assumption in partner valuations despite the drawn-out partner search into H1 2026.

    The shift from a proposed 50% stake for Sibanye-Stillwater to a 40% stake on offer now suggests ioneer is aiming to retain more upside in the US lithium-boron market, a pattern seen in several recent critical minerals deals where juniors preserve operatorship while using strategic partners mainly for balance sheet strength and offtake security.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Harbour Mining Survey on Chinese vs Western tech: key takeaways for mine planners
    Mining
    about 6 hours ago

    Harbour Mining Survey on Chinese vs Western tech: key takeaways for mine planners

    A new Harbour Mining Survey of 100+ global mine operators and contractors compares confidence in Chinese versus Western mining technology and equipment, ahead of bauma CHINA 2026 in Shanghai. Respondents assess Chinese OEMs’ capabilities in battery-electric haul trucks, autonomous fleet systems and ultra-class hydraulic shovels against established Western suppliers such as Caterpillar, Komatsu and Sandvik. Findings point to faster adoption of Chinese equipment in surface coal and iron ore operations, with lingering concerns around software integration, lifecycle support and export‑market parts logistics.

    Mining
    about 18 hours ago

    Caterpillar R2900 XE at K+S Borth: diesel-electric LHD lessons for mine engineers

    Caterpillar’s R2900 XE diesel-electric LHD has been deployed since September 2026 at K+S’s Borth rock salt mine in Rheinberg, North Rhine-Westphalia, loading and hauling ore to underground tipping points. The Borth operation, the last active mine on the Lower Rhine, produces about 2.4 Mt/y of mined salt, giving Caterpillar a high-volume industrial minerals reference site for the R2900 XE. For engineers, the trial offers data on diesel-electric performance, availability and energy use in continuous salt mining conditions.

    ElementUSA–Geophysx Jamaica MOU: residue-to-minerals pilot insights for mine planners
    Mining
    about 18 hours ago

    ElementUSA–Geophysx Jamaica MOU: residue-to-minerals pilot insights for mine planners

    ElementUSA has signed an MOU with Geophysx Jamaica Limited to pilot processing of Jamaica’s extensive bauxite residue deposits into critical minerals and pig iron, using recovery technology proven at ElementUSA’s Critical Resource Accelerator in Cedar Park, Texas, which is backed by the US Departments of War and Energy. The pilot, to be run at new and existing Jamaican facilities, will feed into feasibility studies and the design of a commercial-scale plant, subject to financing and regulatory approvals. Geophysx will provide licensed access to residue sites and manage local stakeholder engagement, aiming to convert long‑standing red mud storage areas into a new, Jamaican‑led industrial sector.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental