Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Harmony Eva copper project: Metso contract design implications for mine engineers

    December 7, 2025|

    Reviewed by Joe Ashwell

    Harmony Eva copper project: Metso contract design implications for mine engineers

    First reported on Australian Mining

    30 Second Briefing

    Harmony Gold has advanced its Eva copper project in Queensland by awarding Metso a major equipment contract as the greenfield mine moves towards site construction. The deal covers key comminution and processing plant components, with Metso to supply crushing and grinding equipment sized for large-scale copper throughput at one of Australia’s biggest planned copper developments. The contract signals design lock-in for the process flowsheet and allows detailed engineering, foundation design and construction scheduling to proceed on a firmer basis.

    Technical Brief

    • Lock-in of OEM packages enables finalisation of concrete foundation loads and dynamic vibration criteria.
    • Harmonised equipment selection allows detailed layout of transfer towers, stockpiles and conveyor routing.
    • Early vendor engagement reduces interface risk between comminution, flotation and tailings handling systems.
    • Standardisation on a single OEM simplifies spares strategy, maintenance planning and operator training regimes.

    Our Take

    Harmony’s US$1.6 billion build-out of the Eva copper project in Queensland, alongside output from the CSA mine in New South Wales, signals a deliberate pivot in our database from its historic gold focus towards a multi-asset copper profile in Australia.

    Metso’s circa-€55 million equipment and services package for Eva, plus its recent launches of the Grande Series screens and third-generation OKTOP® Cooling Tower, indicate the supplier is using Australian copper projects as early adopters for its higher-capacity, process-intense technologies.

    Among the 52 copper-tagged pieces in our coverage, Eva stands out as one of the larger greenfield commitments in a mature jurisdiction like Australia, contrasting with many recent copper items that centre on earlier-stage Andean porphyry plays in Argentina and Chile.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Perpetua–INL minerals recovery pilot: flowsheet and design insights for mine engineers

    Perpetua Resources has signed an agreement with Idaho National Laboratory, operated by Battelle Energy Alliance, to host, commission and run a flexible, modular pilot plant to recover critical and defence-related minerals, including antimony, from Perpetua’s orebodies. The pilot is expected to test flowsheets for selective antimony recovery alongside other strategic elements, using containerised process modules that can be reconfigured for different ore types and chemistries. Outcomes will inform full‑scale processing design for the Stibnite Gold Project and potential US domestic supply chains for military‑grade antimony products.

    Mining
    about 7 hours ago

    Aurecon–Rio Tinto Iron Ore sustaining capital: key brownfield insights for engineers

    Aurecon has been appointed Engineering Program Partner for Rio Tinto Iron Ore’s Sustaining Capital teams in Western Australia from October 2025 to October 2028, extending its long-running role on Pilbara brownfield projects. The mandate covers multi‑disciplinary engineering for fixed plant, rail and port assets across RTIO’s iron ore network, including structural upgrades, materials handling improvements and life‑extension works on existing processing infrastructure. For geotechnical and civil teams, the partnership signals continued demand for staged upgrades, brownfield tie‑ins and asset integrity assessments rather than major greenfield expansions.

    Mining
    about 7 hours ago

    Iron Mine Contracting–Covalent Mt Holland deal: mining scope and risks for planners

    Iron Mine Contracting has secured a 39‑month mining services contract with Covalent Lithium to deliver drill, blast, load and haul, and run‑of‑mine management at the Mt Holland hard‑rock lithium operation in Western Australia’s Goldfields. The scope covers full open‑pit production support for Covalent’s Mt Holland mine and concentrator, which will feed spodumene concentrate to the company’s Kwinana Refinery now in commissioning. The deal signals long‑term third‑party involvement in both production drilling and material movement at one of Western Australia’s key lithium projects.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.