Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Gold price extends gain amid US–Iran standoff: planning notes for mine projects

    February 28, 2026|

    Reviewed by Joe Ashwell

    Gold price extends gain amid US–Iran standoff: planning notes for mine projects

    First reported on MINING.com

    30 Second Briefing

    Gold extended gains on Friday as the US–Iran nuclear standoff escalated, with spot prices up 1.2% to above $5,250/oz and silver jumping 6% to $94/oz. Bullion has rebounded from last month’s 10% single-day crash, remains about 20% higher year-to-date, and is holding technical support above $5,000/oz. Inflows into gold-backed ETFs this week have more than offset late-January outflows, while traders also price in potential 2026 US rate cuts flagged by Chicago Fed President Austan Goolsbee.

    Technical Brief

    • Single-day gold price drop exceeded 10% last month, the steepest fall since 1980.
    • If current levels hold, bullion logs seven consecutive monthly gains, longest streak since 1973.
    • Silver’s intraday move reached +6% to $94/oz, amplifying volatility across precious metals.
    • US–Iran nuclear talks remain stalled, with both parties only agreeing to reconvene next week.
    • President Trump has ordered a substantial build-up of US military assets in the Middle East theatre.
    • US officials reportedly left the latest negotiation round “disappointed”, signalling elevated geopolitical risk premia.
    • Weekly ETF inflows have already fully reversed late-January outflows linked to the prior crash.
    • Chicago Fed President Austan Goolsbee flagged “several” possible rate cuts this year, conditional on lower inflation.

    Our Take

    The 1.2% intraday move in gold and 6% in silver in this US–Iran context is modest compared with the extreme safe‑haven spikes seen in late‑2025 coverage, where gold rallies above 70% year‑to‑date were recorded, suggesting current geopolitical risk is being priced as a short‑term flare‑up rather than a structural shock.

    China’s near-69% month‑on‑month jump in net gold imports via Hong Kong aligns with other recent gold pieces in our database that emphasise central bank and Asian physical buying as the main backbone of demand, which tends to dampen downside for producers even when Western ETF flows are volatile.

    With gold already up about 20% this year and potentially marking a seventh straight monthly gain, the pricing backdrop for new gold and silver projects in the Middle East and North America in our coverage is materially stronger than during the prior month’s >10% sell‑off, improving the economics of marginal deposits and expansions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers
    Mining
    2 days ago

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers

    Buffalo Potash has secured Saskatchewan approval to complete construction and operate its Disley initial production module, a 125,000 t/y soluble-grade potash facility 50 km northwest of Regina using a patented horizontal line-drive brine circulation method through parallel horizontal wells. The C$41.5 million module will test selective underground dissolution of potassium chloride with sodium-chloride-saturated brine and supply local agriculture, drilling-fluid markets and potassium-chloride brine for regional oilfields, ahead of planned 500,000 t/y Disley East and West expansions to about 1.13 Mt/y. The permit, which runs to 30 April and excludes future modules, requires groundwater characterisation, air-quality compliance and financial assurance, while the project proceeds without a feasibility study or declared reserves, elevating technical and economic risk.

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners
    Mining
    2 days ago

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners

    Exiro Minerals, Orion Resource Partners and Canada Growth Fund have acquired an 81.1% stake in Vale’s Thompson nickel operations in northern Manitoba, committing up to US$200 million to sustain and develop the six-decade-old complex. The new vehicle, Exiro Nickel, takes over day-to-day control of two operating underground mines, the adjacent concentrator and exploration ground along the 135 km Thompson Nickel Belt, while Vale Base Metals retains an 18.9% interest. A multi-year offtake agreement keeps Vale buying nickel concentrate from the Thompson mill, providing a defined outlet for future production.

    Mining
    2 days ago

    Moeve–Emerita 100% renewable diesel deal in Spain: decarbonisation notes for mines

    Moeve and Emerita Resources have signed Spain’s first mining-sector agreement to deploy 100% renewable diesel (HVO) at industrial scale, designating Moeve as preferred supplier of this second-generation biofuel. The HVO, derived from waste and residue feedstocks rather than food crops, is claimed to cut lifecycle CO2 emissions by up to 90% compared with conventional diesel. For mine operators, the drop-in fuel compatibility with existing diesel engines offers a near-term route to decarbonise haul trucks and auxiliary fleets without major equipment changes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental