GMI Construction Group profit surge: delivery and pipeline insights for project teams
Reviewed by Tom Sullivan

First reported on The Construction Index
30 Second Briefing
Profits at GMI Construction Group rose sharply for the year to 30 September 2025, with profit before tax more than doubling to £2.31m on virtually flat turnover of £233.0m and gross margin improving from 3.3% to 4.8%. Cash at bank increased to £22.5m as the contractor delivered over 880,000 sq ft of industrial and logistics space and a 267,000 sq ft office scheme at Circle Square in Manchester, plus the Dakota Hotel in Newcastle and Hyatt Hotel in Leeds. Framework-delivered public sector projects now contribute 13% of turnover, up from 4%, giving a more visible forward pipeline for complex commercial, hotel and PBSA work.
Technical Brief
- Financial year reference point is 30 September 2025, useful for benchmarking pipeline timing and cycles.
- Gross profit increased to £11.3m from £7.7m year-on-year, indicating tighter cost and risk control.
- Cash at bank rose to £22.5m from £19.3m, improving working capital for large pre-fund construction packages.
- Industrial and logistics delivery exceeded 880,000 sq ft, signalling strong exposure to shed/warehouse and last‑mile schemes.
- Multi-room capability evidenced by completion of Dakota Hotel, Newcastle, and Hyatt at Sovereign Square, Leeds.
- PBSA schemes are progressing concurrently in Bristol, York and Manchester, diversifying beyond pure commercial and hotel work.
- Framework-delivered public sector work increased from 4% to 13% of turnover, materially smoothing workload visibility and bid overheads.
Our Take
The step-up in framework-delivered work to 13% of turnover suggests GMI Construction Group is locking in more repeat public and quasi-public clients, which typically stabilises workload across regional markets like Leeds, Manchester and Bristol.
Compared with other UK contractors in our Infrastructure coverage, GMI’s rising cash at bank alongside modest profit before tax signals a relatively conservative balance sheet that should support bidding and bonding capacity on schemes such as the £50m Freshney Place redevelopment.
Circle Square and the hotel schemes in Manchester and Leeds position GMI in higher-spec city-centre work, which in our database tends to carry tighter margins but better pipeline visibility than one-off shed or light industrial projects.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
QCDB-io
Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.


