Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    FLS comminution for South American copper concentrator: SAG circuit notes for engineers

    December 18, 2025|

    Reviewed by Tom Sullivan

    FLS comminution for South American copper concentrator: SAG circuit notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    FLS has secured an order to supply core comminution equipment for a greenfield copper concentrator in South America, centred on a 1600 x 2400 TSU gyratory crusher and two Raptor 900 cone crushers. The grinding circuit will use two 34‑ft diameter x 24‑ft long dual‑pinion SAG mills and two 24‑ft diameter mills, giving a high‑throughput, fully FLS-supplied front end. The package signals continued preference for large SAG-based circuits in new copper projects, with implications for power demand, liner wear strategies and maintenance planning.

    Technical Brief

    • TSU gyratory crusher sizing (1,600 mm x 2,400 mm) sets primary feed envelope and dump pocket geometry.
    • Raptor 900 secondary cones imply high-power, medium-fine crushing ahead of SAG feed, affecting F80 control.
    • Dual-pinion drives on both 34‑ft SAG mills distribute torque, easing girth gear alignment and maintenance.
    • Matching supplier for crusher, cones and mills simplifies spares strategy and liner/consumables standardisation.
    • Fully FLS comminution front end enables single OEM process guarantees on throughput and grind size.
    • Greenfield status allows plant layout to optimise crusher–stockpile–mill transfer, minimising transfer points and dust.
    • Common OEM control philosophy across crusher and mill drives can streamline advanced process control integration.

    Our Take

    FLS also recently secured a DKK 235 million process equipment package for the Black Volta gold project in Ghana, signalling that the company is increasingly winning full comminution and concentrator scopes across both copper and gold in emerging markets.

    In our database of 368 Mining stories, copper projects like this South America concentrator tend to feature larger SAG mill installations than gold plants, so the 34 ft dual-pinion configuration suggests a mid-to-upper tier throughput design rather than a small satellite operation.

    Deploying a 1,600 x 2,400 mm TSU gyratory crusher with multiple 24 ft class mills indicates the copper plant is being engineered for high primary crushing capacity, which typically aligns with low- to medium-grade ore bodies where economies of scale are critical to project economics.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.