Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    First Quantum’s $190M Cobre Las Cruces sale: project and process notes for mine planners

    December 24, 2025|

    Reviewed by Tom Sullivan

    First Quantum’s $190M Cobre Las Cruces sale: project and process notes for mine planners

    First reported on MINING.com

    30 Second Briefing

    First Quantum Minerals has agreed to sell the past‑producing Cobre Las Cruces copper mine in southern Spain to Global Panduro, controlled by Resource Capital Funds, for up to $190 million, with $45 million cash on closing, a $65 million loan note and about $80 million in milestone‑linked deferred payments. The asset includes a high‑grade open‑pit mine and hydrometallurgical plant near Seville that produced copper cathode from 2009–2021 and reprocessed tailings until 2023. Resource Capital plans a polymetallic primary sulphide project targeting copper, zinc, lead and silver, while First Quantum redirects liquidity after Cobre Panama’s shift to preservation and safe maintenance.

    Technical Brief

    • Transaction structure includes a $65 million loan note plus about $80 million milestone‑linked deferred payments.
    • Additional deferred payments are tied to exit and liquidity events, effectively sharing future project upside.
    • Existing hydrometallurgical plant near Seville previously produced copper cathode from 2009–2021, then treated tailings to 2023.
    • Las Cruces lies about 20 km northwest of Seville, with established open‑pit workings and site infrastructure in place.
    • First Quantum’s divestment follows a year of debt restructuring and a separate $1 billion streaming agreement to bolster liquidity.
    • Resource Capital views Las Cruces as a European base‑metals platform aligned with long‑term AI and grid‑electrification demand.

    Our Take

    First Quantum’s decision to monetise Las Cruces in Spain comes as our coverage shows the company repeatedly referenced in 2025 copper price records tied to Cobre Panamá outages, suggesting this divestment is part of a broader balance-sheet and portfolio reset after that disruption.

    The sale of a European hydrometallurgical copper asset like Las Cruces, with production already wound down, effectively concentrates First Quantum’s exposure back into larger, higher-risk jurisdictions, which may heighten investors’ sensitivity to operational or permitting shocks at remaining flagship assets.

    For Global Panduro and Resource Capital Funds, acquiring a permitted brownfield copper site in southern Spain positions them in a region with comparatively stable European regulatory frameworks, which can be attractive for securing future offtake or financing in a tight copper market highlighted in recent price-peak coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Copper price 2025 surge: supply shocks and project signals for mine planners
    Mining
    about 8 hours ago

    Copper price 2025 surge: supply shocks and project signals for mine planners

    Copper prices set fresh records above $12,000/t in London and $5.60/lb in Chicago in 2025, amid outages at Grasberg, El Teniente, Kamoa-Kakula, Quebrada Blanca II and Cobre Panamá, and mounting geopolitical friction over US tariffs and Chinese processing dominance (53.1% of global capacity). Analysts are split, with Goldman Sachs seeing a 160 kt surplus capping 2026 prices at $10,000–$11,000/t, while Bank of America and BloombergNEF project spikes to $15,000/t and a 19 Mt structural deficit by 2050. Technically significant stories include Freeport’s 400 kt sulfide leach push at Morenci, the stalled deep-shaft Resolution Copper project in Arizona, and the proposed $53 billion Anglo–Teck merger that could create a copper complex larger than Escondida’s 1.28 Mt/y output.

    Super Copper’s Cordillera project approval: permitting and drill path notes for mine planners
    Mining
    about 9 hours ago

    Super Copper’s Cordillera project approval: permitting and drill path notes for mine planners

    Super Copper’s Cordillera Cobre project in Chile’s Atacama copper belt has secured approval for 26 exploitation concessions from Sernageomin, covering about 6,858 hectares and granting full, permanent mining rights once registration in the Copiapó Mining Registry is complete. The company reports 25 concessions already have formal court resolutions and 15 have legal extracts published in the Official Mining Gazette, with title registration now in progress. CEO Zachary Dolesky says this clears the way to submit a drill programme as soon as results from the latest exploration work are finalised.

    Gold price tops $4,500: macro drivers and project economics lens for miners
    Mining
    about 12 hours ago

    Gold price tops $4,500: macro drivers and project economics lens for miners

    Gold rose to a record $4,524.68/oz in early Wednesday trading before easing towards $4,450, capping a year-to-date gain above 70% driven by central bank buying, ETF inflows and safe-haven demand linked to Venezuela tensions and expected US rate cuts. Silver hit an all-time high of $72.70/oz, up more than 150% this year after an October short squeeze and ongoing supply dislocations that have left large inventories concentrated in New York pending a US Commerce Department critical-minerals probe. Platinum climbed past $2,300/oz for the first time in the Bloomberg series, extending a 10-session rally on tight supply and high borrowing costs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy