Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    EnergyX enters nuclear materials market: isotopes, Smackover project lens for mine planners

    January 23, 2026|

    Reviewed by Joe Ashwell

    EnergyX enters nuclear materials market: isotopes, Smackover project lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Energy Exploration Technologies (EnergyX) has launched its NUKE-it platform to produce nuclear-grade lithium isotopes, targeting 15% enriched Lithium-6 for tokamak fusion and 99.999% pure Lithium-7 for thorium molten salt fission reactors. Building on its GET-Lit DLE extraction and refining suite, the company is tying isotope production to its Lonestar Lithium project in the Smackover formation, where it now controls 47,500 acres of lithium-rich brine after a US$26 million land deal. Uranium and thorium materials from upper Smackover limestone reservoirs in Arkansas and Louisiana are planned as follow-on products.

    Technical Brief

    • NUKE-it platform targets nuclear-grade lithium salts engineered specifically for reactor-grade performance requirements.
    • EnergyX’s Lonestar Lithium demonstration plant in southwest Arkansas is described as “near-completed”.
    • Additional 35,000 acres in the Smackover were purchased for US$26 million to expand brine access.
    • Uranium occurrence is associated with upper Smackover limestone reservoirs in southern Arkansas and northern Louisiana.
    • NUKE-it is explicitly framed as supporting advanced nuclear reactor supply chains, including future uranium and thorium products.
    • Platform is positioned to address a domestic supply gap for high-specification nuclear materials within US energy security policy.

    Our Take

    Among the 16 keyword-matched pieces on uranium and lithium isotopes in our database, this is one of the few that links brine-hosted lithium in the Smackover formation with nuclear-grade lithium-6 and lithium-7, signalling a niche where DLE-style brine projects could feed directly into advanced reactor and fusion supply chains.

    The US locations cited (southern Arkansas, northern Louisiana, Texas and Florida) align with regions where other Smackover and Gulf Coast brine projects in our coverage are targeting battery-grade lithium, so EnergyX’s NUKE-it and GET-Lit work suggests operators there may be able to chase both EV and nuclear markets from the same resource base.

    Achieving 15% Li-6 enrichment and 99.999% Li-7 purity positions EnergyX in a very small group of players in our uranium- and isotope-tagged coverage that are technically aligned with non-proliferation-compliant reactor fuel specs, which could give the Lonestar Lithium project a regulatory and offtake advantage over conventional lithium-only brine projects in the USA.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Rosh Pinah Zinc paste backfill plant: design and dilution control notes for engineers
    Mining
    about 14 hours ago

    Rosh Pinah Zinc paste backfill plant: design and dilution control notes for engineers

    Rosh Pinah Zinc has commissioned Namibia’s first paste backfill plant at the Rosh Pinah zinc-lead-silver mine, enabling cemented paste backfilling of underground stopes to cut dilution, reduce surface tailings and improve ore recovery while being run by a locally trained operations team. The RP2.0 expansion, now over 85% complete and targeting Q3 2026 completion, includes a new portal and decline, new paste fill and processing facilities, a SAG mill and water treatment plants. In parallel, RPZ is executing more than 80 km of diamond drilling to 2027, covering infill, step-out and regional targets to extend mine life.

    Saudi graphite plant at Yanbu: capex, supply chain and JV lens for mine planners
    Mining
    about 18 hours ago

    Saudi graphite plant at Yanbu: capex, supply chain and JV lens for mine planners

    Northern Graphite will prioritise a US$200 million battery anode material plant at Yanbu, Saudi Arabia, with initial capacity of 25,000 tonnes per year from 2028, supplied by the restarted Okanjande graphite mine in Namibia (planned 31,000 t/y over 10 years at a restart cost of about US$35 million). Partner Al Obeikan will hold 51%, lead local debt raising, and tap the Saudi Industrial Development Fund to cover 50–75% of capex, leveraging fast permitting. Planned 20,000 t/y plants in Baie-Comeau, Quebec and France are now secondary, with CEO Hugues Jacquemin calling the Saudi deal a “wake-up call” for stronger power allocations and incentives.

    Wheaton Precious Metals CEO transition: key strategic notes for project teams
    Mining
    about 18 hours ago

    Wheaton Precious Metals CEO transition: key strategic notes for project teams

    Wheaton Precious Metals will appoint current president Haytham Hodaly as president and CEO and Board member from 31 March 2026, with long-serving CEO and co‑founder Randy Smallwood moving to non‑executive Chair and current Chair George Brack becoming Lead Independent Director. Hodaly, a mining engineer and former RBC mining analyst, has led over US$11 billion in streaming transactions since joining Wheaton in 2012, shaping its deal pipeline and technical due diligence. The succession keeps strategic continuity at one of the sector’s largest precious metals streaming companies as it targets new gold and silver projects.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.