Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Draslovka–Barrick Nevada Gold Mines NaCN deal: supply-chain lens for process engineers

    March 11, 2026|

    Reviewed by Joe Ashwell

    Draslovka–Barrick Nevada Gold Mines NaCN deal: supply-chain lens for process engineers

    First reported on International Mining – News

    30 Second Briefing

    Draslovka a.s has secured a supply contract to provide sodium cyanide (NaCN) to Barrick Mining Corporation’s Nevada Gold Mines, the largest gold mining complex in the United States. The deal centres on maintaining reliable NaCN deliveries for large-scale heap leach and CIL/CIP circuits, where reagent continuity directly affects gold recovery and plant throughput. For process and supply-chain engineers, the agreement signals continued reliance on conventional cyanide leaching chemistry, with operational risk now tied more to logistics and vendor performance than to reagent substitution.

    Technical Brief

    • Reliable NaCN supply reduces the need for high on‑site inventory, lowering storage risk and working capital.
    • For similar multi‑mine hubs, single‑vendor cyanide contracts can simplify chain‑of‑custody and regulatory reporting.

    Our Take

    Sodium cyanide shows up only rarely in our 1105 Mining stories compared with gold itself, so a dedicated supply deal into Nevada Gold Mines signals how reagent security is becoming a distinct strategic issue for large US gold operations.

    For Barrick Mining Corporation’s Nevada Gold Mines, locking in a specialised US-focused supplier like Draslovka a.s may help insulate heap leach and CIL/CIP circuits from import or transport disruptions that have periodically affected cyanide availability in North America.

    Among the 1994 tag-matched ‘Projects’ and ‘Contract Award’ pieces in our database, most US gold items focus on mine expansion or processing upgrades rather than chemical offtake, suggesting this contract formalises a critical cost and ESG-controlled input that is usually handled more quietly in project disclosures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Top 50 mining companies add $250bn in 2026: capital and project signals for engineers
    Mining
    1 day ago

    Top 50 mining companies add $250bn in 2026: capital and project signals for engineers

    Global mining majors added $250 billion in value in early 2026, lifting the MINING.COM Top 50 to a combined $2.41 trillion despite the US–Iran war and volatile gold at about $4,700/oz and silver above $70/oz, both off record spikes. BHP briefly exceeded a $200 billion market capitalisation, copper contributed $7.95 billion to its half‑year operating earnings, and six miners – including Agnico Eagle, Zijin Mining, Southern Copper and Newmont – now sit in the $100‑billion club. At the other end, Amman Minerals fell 27% on Indonesian smelter delays and Ivanhoe Mines cut Kamoa‑Kakula 2026 copper guidance to 290,000–330,000 tonnes, dropping it below the $18 billion Top 50 cut‑off.

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners
    Mining
    2 days ago

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners

    Canadian processor pH7 Technologies is expanding its Vancouver facility, backed by up to C$4 million from NRC IRAP, to scale its organo-electrochemical platform that recovers platinum, palladium and rhodium from secondary materials without toxic reagents or tailings wastewater. The commercial plant already processes spent catalytic converters, producing 30,000–40,000 oz of platinum-equivalent PGMs per year under a tolling and offtake model involving partners such as Mitsubishi. pH7 is now piloting electrochemically generated oxidants to heap leach chalcopyrite and other sulphide ores without cyanide, targeting on-site mine deployment within 1–2 years across South America, Africa and Australia.

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers
    Mining
    3 days ago

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers

    Dellner Bubenzer is supplying a wide range of industrial brakes and couplings for mining hoists, slewing drives and belt conveyors, developed in long-term collaboration with OEMs. The company focuses on both service and emergency braking solutions tailored to heavy-duty mining duty cycles and harsh environments, addressing controlled hoisting, precise slewing and high-tension conveyor stopping. For engineers, the key point is an integrated approach to drivetrain and braking design, rather than bolt-on safety systems, across multiple critical mining applications.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.