Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability

    DESNZ floating and geological gas storage: design and risk notes for engineers

    December 9, 2025|

    Reviewed by Joe Ashwell

    DESNZ floating and geological gas storage: design and risk notes for engineers

    First reported on New Civil Engineer

    30 Second Briefing

    The Department for Energy Security and Net Zero is assessing options for a new floating storage and regasification unit (FSRU) and a strategic geological gas storage facility to bolster UK gas resilience. An FSRU would provide ship-based LNG storage and regasification at an import terminal, while geological storage would likely use depleted gas fields or salt caverns for high-volume, seasonal buffering. The work signals potential demand for large-diameter offshore pipelines, high-pressure injection wells and long-term integrity management of underground gas containment.

    Technical Brief

    • FSRU mooring concepts would likely include turret or spread moorings designed for metocean conditions.
    • Offshore geotechnical campaigns would need CPTs, vibrocores and boreholes to characterise soft marine sediments beneath moorings and pipelines.
    • Geological storage options trigger appraisal of caprock integrity, fault sealing behaviour and legacy well abandonment quality.
    • Salt cavern concepts would require leaching design, cavern spacing rules and cyclic pressure-fatigue assessment of halite.
    • Depleted field storage would demand reservoir simulation of multi-cycle gas injection–withdrawal and pore pressure evolution.
    • Integrity management planning must address long-term monitoring: microseismic arrays, pressure gauges and periodic well logging.
    • For other energy-transition assets, similar subsurface characterisation workflows can be reused with modified design envelopes.

    Our Take

    Gas-related items in our database are relatively few compared with power and mining coverage, so DESNZ exploring both floating storage and regasification units (FSRUs) and strategic geological storage in the United Kingdom signals that gas security is becoming a more prominent geotechnical design driver rather than just an energy-market issue.

    For UK practitioners, geological gas storage implies renewed attention to salt caverns, depleted fields and caprock integrity, whereas FSRUs shift risk towards marine geotechnics and mooring in exposed conditions, so firms with both offshore and subsurface capability are likely to be better placed for upcoming DESNZ-led work.

    Among the 484 Projects/Sustainability-tagged pieces in our coverage, relatively few combine long-lived subsurface infrastructure with floating assets, suggesting that permitting and environmental assessment frameworks for these hybrid gas facilities may be less mature than for conventional onshore storage or LNG terminals.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sizewell C tunnel redesign vs Hinkley Point C: geotechnical lessons for engineers
    Geotechnical
    1 day ago

    Sizewell C tunnel redesign vs Hinkley Point C: geotechnical lessons for engineers

    Ground conditions at Sizewell C have forced the Civil Works Alliance to depart from the Hinkley Point C reference design for the offshore intake and outfall tunnels, driving new solutions for lining, support and construction sequencing. Contractors have had to re-optimise tunnel geometry and TBM drive strategy for the North Sea sediments and local stratigraphy, rather than the harder rock and different stress regime at Hinkley. The changes affect segment design, joint detailing and groundwater control, with direct implications for durability, settlement behaviour and marine interface works.

    Encinal High School Stadium ground improvement: seismic design lessons for engineers
    Geotechnical
    14 days ago

    Encinal High School Stadium ground improvement: seismic design lessons for engineers

    Keller has completed a ground improvement scheme for Encinal High School Stadium in Alameda, California, collaborating with the project geotechnical engineer to satisfy California Geological Survey seismic requirements. The solution, delivered as part of a larger stadium renovation, used ground improvement to mitigate liquefaction and lateral spreading risks identified in the site’s young bay mud and loose granular fills. For practitioners, the project shows how early contractor–engineer integration can tailor seismic ground improvement to school facilities on soft, seismically active coastal deposits.

    AGS Chair’s July 2024 update: safety data, report quality and EDI notes for geoengineers
    Geotechnical
    19 days ago

    AGS Chair’s July 2024 update: safety data, report quality and EDI notes for geoengineers

    AGS’s July update launches an Early Careers Video, “Discovering a Rewarding Career in the Geo-Industry”, for use by industry representatives in schools and universities, and reports 2023 geotechnical and geoenvironmental accident statistics based on a 127% increase in contributing organisations. A new two-part SiLC PTP series critiques the standard of land contamination reports submitted through the planning system, echoing regulator concerns about report quality and consistency. Forthcoming events include a 25 September EDI-focused webinar and a November Manchester meeting on groundwater impacts across design and construction stages.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.