    Denison’s Phoenix ISR uranium mine: design, capex and risk notes for engineers

    February 25, 2026|

    Reviewed by Tom Sullivan

    Denison’s Phoenix ISR uranium mine: design, capex and risk notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Denison Mines will begin construction in March on the C$419 million Phoenix uranium mine in Saskatchewan’s southeast Athabasca basin, Canada’s first in-situ recovery (ISR) uranium operation, targeting first production by mid-2028. The Wheeler River project’s Phoenix deposit carries proven reserves of 6,300 tonnes at 24.5% U3O8 and probable reserves of 212,700 tonnes at 11.4% U3O8, with a 2023 feasibility study giving a post-tax NPV of C$1.16 billion and 90% IRR over a 10-year life. ISR wellfields will eliminate pits, ore handling, crushing and grinding, reducing surface disturbance and tailings compared with conventional underground plans at the adjacent Gryphon deposit.

    Technical Brief

    • ISR mining at Phoenix injects leaching solution via wells, mobilising uranium and pumping pregnant liquor to surface.
    • Elimination of pits and waste rock handling sharply reduces tailings volume and surface disturbance versus hard‑rock methods.
    • Shorter construction schedule is enabled by omitting ore handling, crushing and grinding plant from the flowsheet.
    • Federal environmental assessment and associated licences were granted only days before the C$419 million build decision.
    • Phoenix lies ~550 km north of Regina in the southeast Athabasca basin, influencing logistics and power‑supply planning.
    • Denison operates Wheeler River with a 90% interest; JCU (Canada) Exploration holds the remaining 10%.
    • Adjacent Gryphon deposit is planned as a conventional underground mine, giving a hybrid ISR–underground district development.

    Our Take

    With a post-tax NPV of C$1.16 billion and an internal rate of return of 90% over a 10-year mine life, Wheeler River sits at the very top end of project economics in our uranium database, which is likely to sharpen competitive pressure on higher-cost Athabasca basin developments such as NexGen’s Rook I and Fission’s Patterson Lake South.

    The recent CNSC licence decision and the appointment of Wood Canada Limited as construction manager, both covered in related February 2026 items, indicate that Denison Mines has already de-risked the regulatory and execution fronts more than many peer uranium projects in northern Saskatchewan at a similar capex scale of around C$419 million.

    Denison’s 90% interest in Phoenix/Wheeler River, with JCU (Canada) Exploration at 10%, gives it unusually concentrated exposure to high-grade uranium compared with several other Athabasca basin JVs in our coverage, which often dilute operators’ upside across more fragmented ownership structures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Caterpillar electrification field trials: haul truck design lessons for mine engineers

    Caterpillar Product Support Manager Jeremy Byrd details how field trials of battery‑electric and trolley‑assist haul trucks are shaping the company’s electrification support model for large open pits. Recurrent customer questions centre on duty‑cycle modelling, charger placement around shovel faces and dumps, grid stability for multi‑megawatt fast chargers, and integration with existing diesel fleets. Byrd points to early projects using Cat® MineStar™ data, real‑time energy monitoring and iterative route redesign as critical for sizing on‑board energy storage and planning phased infrastructure roll‑outs.

    Lynas Rare Earths profit surge: mine expansion and processing insights for engineers
    Mining
    about 4 hours ago

    Lynas Rare Earths profit surge: mine expansion and processing insights for engineers

    Lynas Rare Earths has reported record profits on the back of surging global demand for rare earth oxides used in permanent magnets for EV motors and wind turbines, enabling accelerated expansion of its Mt Weld mine and downstream processing. CEO Amanda Lacaze is pushing ahead with capacity growth at the Western Australian concentrator and the new Kalgoorlie cracking and leaching plant, designed to reduce reliance on offshore processing. For mine planners and process engineers, the move signals sustained demand for high-grade monazite-hosted rare earth ores and long-term justification for beneficiation and hydrometallurgical upgrades.

    BHP’s iron ore edge: mine planning and product quality lessons for engineers
    Mining
    about 5 hours ago

    BHP’s iron ore edge: mine planning and product quality lessons for engineers

    BHP chief executive Mike Henry has reaffirmed the company’s iron ore advantage, citing world‑leading EBITDA margins and stronger free cash flow from its Western Australia Iron Ore (WAIO) operations compared with Rio Tinto and Vale. He pointed to sustained low unit costs across BHP’s Pilbara hubs and a high proportion of lump and premium fines products as key drivers of realised price and margin resilience through the cycle. For mine planners and process engineers, the message is continued emphasis on low‑strip orebodies, efficient rail‑port integration and product quality control to defend cost and price premia.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy