Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Costain’s £100M M5 Somerset junction: design and risk notes for civils teams

    January 27, 2026|

    Reviewed by Joe Ashwell

    Costain’s £100M M5 Somerset junction: design and risk notes for civils teams

    First reported on New Civil Engineer

    30 Second Briefing

    Costain has secured a £100M, five-year design-and-build contract for a new junction on the M5 near Bridgwater, Somerset, to provide direct access to a planned gigafactory site. The scheme will require complex tie-ins to live motorway carriageways and associated slip roads, with staging and traffic management critical on this heavily trafficked strategic corridor. For geotechnical and civils teams, early ground investigation, settlement control around existing pavements, and drainage upgrades to motorway standards will be key risk drivers.

    Technical Brief

    • Contract value of about £100M indicates major civils and geotechnical work scope over the programme.
    • Five-year duration suggests extended design development, statutory process, and staged construction under traffic.
    • Junction is being delivered specifically to serve a planned gigafactory, so heavy goods access geometry will dominate.
    • Long contract period allows early contractor involvement-style optimisation of earthworks balance and materials sourcing.
    • Similar motorway access schemes for large industrial hubs (e.g. logistics parks) show growing co-dependency between highways and private-sector mega-projects.

    Our Take

    Costain’s presence across multiple major UK schemes in our database – from HS2’s Skanska Costain Strabag JV tunnels to leadership changes linked with Sizewell C – suggests this Somerset road contract reinforces its positioning as a go‑to Tier 1 for nationally significant infrastructure.

    A five‑year programme for the new M5 junction aligns with the longer delivery horizons seen on other Costain‑involved corridors in our coverage, which typically allows integration of traffic management, digital monitoring and staged handover to minimise disruption on strategic routes.

    Among the 547 Infrastructure stories in our database, relatively few regional highway upgrades are directly tied to gigafactory access, so this Somerset scheme is likely to become a reference case for how UK roads agencies and OEM‑linked investors structure enabling works for battery manufacturing clusters.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 9 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 8 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.