Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    CleanTech Lithium’s 40‑year Chile CEOL: tenure and design implications for mine planners

    March 10, 2026|

    Reviewed by Tom Sullivan

    CleanTech Lithium’s 40‑year Chile CEOL: tenure and design implications for mine planners

    First reported on MINING.com

    30 Second Briefing

    CleanTech Lithium has agreed a 40‑year special operating contract (CEOL) with Chile’s mining ministry for the Laguna Verde brine project, covering 153 km² from exploration through to closure and giving direct contractual backing from the Chilean state. Laguna Verde holds a JORC‑compliant resource of 1.9 million tonnes at an average 174 mg/L lithium carbonate, with a 2023 scoping study outlining 20,000 tpa LCE over 30 years and a pre‑feasibility study due this quarter. The CEOL, one of only a few granted in Chile and still subject to Comptroller General ratification, materially reduces tenure risk for project financing and process design decisions.

    Technical Brief

    • CEOL term explicitly spans exploration, evaluation, construction, production and closure over the 153 km² licence.
    • Contract is structured as a decree requiring final ratification by Chile’s Comptroller General’s Office.
    • Laguna Verde brine aquifer has been drilled through multiple campaigns since 2021 to define the current resource.
    • Resource size and grade position Laguna Verde among Chile’s largest lithium brine projects outside the Atacama Salar.
    • Share price moved 4.8% on announcement, approaching a 52‑week high and signalling improved perceived tenure security.
    • CEOL award places Laguna Verde in a small group of Chilean lithium projects with long-term state-backed operating contracts.

    Our Take

    With a JORC resource of 1.9 million tonnes and a 30‑year life outlined in the 2023 scoping study, Laguna Verde sits at the smaller end of Latin American lithium assets in our database, which likely makes the 40‑year contract term more about tenure certainty than scaling to major-brine volumes.

    CleanTech Lithium’s c. £22.3 million market capitalisation is low relative to most Latin American lithium developers in our coverage, so securing long‑dated operating rights in Chile’s Atacama region could materially de‑risk the project pipeline and support future equity or strategic funding rounds.

    The presence of both lithium and gold as tagged commodities, alongside a 1.8% spot gold gain this quarter, underlines how sentiment in precious metals can still influence capital flows into smaller UK‑listed battery metals plays such as CleanTech Lithium, especially when they are advancing long‑life projects in Chile.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Lynas–JARE rare earths deal to 2038: supply-chain and project signals for miners
    Mining
    about 11 hours ago

    Lynas–JARE rare earths deal to 2038: supply-chain and project signals for miners

    Lynas Rare Earths has extended its supply and funding agreement with Japan Australia Rare Earths (JARE) to 2038, locking in long-term offtake for Japanese customers and continued support for its Mt Weld mine and downstream processing assets. The deal secures financing flexibility through JARE’s existing loan facilities while underpinning feedstock for Lynas’ cracking and leaching plants in Kalgoorlie and Kuantan. For rare earths project developers, the move signals sustained Japanese backing for non-Chinese NdPr and heavy rare earth supply chains.

    Thiess leader’s QRC 2026 honour: productivity and safety lessons for mine teams
    Mining
    about 12 hours ago

    Thiess leader’s QRC 2026 honour: productivity and safety lessons for mine teams

    Thiess executive general manager Rae O’Brien has been named Exceptional Woman of 2026 at the Queensland Resources Council and Women in Mining and Resources Queensland awards, recognising her leadership across large open-cut coal and metals operations. O’Brien has overseen multi-year productivity and safety programmes at Thiess, including deployment of autonomous haulage fleets and advanced fleet-optimisation analytics on east coast sites. Her recognition signals continued industry emphasis on senior female leadership in mine planning, contractor management and technology-enabled production improvement across Queensland’s major resource projects.

    Turning waste into revenue: ALLU bucket use cases and economics for mine planners
    Mining
    about 12 hours ago

    Turning waste into revenue: ALLU bucket use cases and economics for mine planners

    ALLU screening and crushing buckets supplied by Total Rockbreaking Solutions are being used in Australian quarrying and mining operations to convert oversize and waste rock into saleable aggregate and fill. By processing byproduct in-situ on loaders and excavators rather than hauling it to fixed plants or waste dumps, sites can recover usable fractions, cut transport and tipping costs, and reduce stockpiled waste volumes. The approach is particularly relevant for brownfield pits with limited space and variable feed, where mobile, attachment-based processing can extend resource life.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.