Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Clarks Gully standout intercept: underground design notes for Hillgrove teams

    January 9, 2026|

    Reviewed by Tom Sullivan

    Clarks Gully standout intercept: underground design notes for Hillgrove teams

    First reported on Australian Mining

    30 Second Briefing

    Recent diamond drilling at Larvotto Resources’ Clarks Gully prospect within the Hillgrove gold–antimony project in New South Wales has returned a “standout intercept”, strengthening the case for higher-grade underground mineralisation. The work forms part of a targeted diamond programme testing extensions of known lodes beneath historical workings at Hillgrove, a past producer with multiple steeply dipping, narrow-vein structures. For geotechnical and mine planning teams, the results point to continued focus on underground access, ground support in vein-hosted systems, and potential sequencing of gold–antimony stopes.

    Technical Brief

    • Core orientation and structural logging are being used to refine vein geometry and continuity models.
    • Steeply dipping, narrow-vein sets at Hillgrove favour selective underground stoping over bulk open-pit methods.
    • Historical underground development provides partial access but will require rehabilitation and modern ground support standards.
    • Antimony–gold association implies variable metallurgical domains, influencing stope sequencing and plant configuration.
    • Existing underground voids and remnant pillars necessitate detailed 3D void modelling for geotechnical stability assessments.
    • Similar vein-hosted antimony–gold systems often adopt tight-spaced drilling to constrain grade variability and dilution risk.

    Our Take

    Hillgrove is one of the relatively few gold–antimony projects in our 530 Mining-story database, which suggests Larvotto Resources is positioned in a niche critical-mineral space rather than in the crowded pure-gold project pipeline.

    NSW projects in our coverage often report longer lead times around permitting and heritage engagement than comparable gold work in WA or Queensland, so strong intercepts at the Clarks Gully prospect may be used to justify early stakeholder and infrastructure planning rather than a slow-burn exploration approach.

    Gold–antimony combinations in our database are frequently linked to refractory or complex ore types, implying that positive drilling at Hillgrove will likely need to be matched with metallurgical testwork and flowsheet optimisation to ensure both metals can be economically recovered.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers
    Mining
    about 7 hours ago

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers

    Brightstar Resources has reported its largest Sandstone result at the Two Mile Hill deposit in WA, intersecting 305m at 2.66g/t gold from 503m depth in diamond hole TMHDD26005. The interval contains multiple high-grade zones, including 4.1m at 26.1g/t, 5.5m at 25.2g/t and 4m at higher-grade material within the broader mineralised envelope. The scale and continuity of this intercept materially upgrade the grade-times-width profile of Two Mile Hill, supporting potential for bulk underground mining scenarios and further deep drilling.

    BHP record WA community spend: procurement signals for mining contractors
    Mining
    about 7 hours ago

    BHP record WA community spend: procurement signals for mining contractors

    BHP has reported a record $1.1 billion in community expenditure across Western Australia for FY2026, including $627 million in procurement from Indigenous and Traditional Owner businesses. The miner’s 2026 Western Australia Community Development Report also details more than $850 million in payments to local suppliers, councils and community partners, signalling a heavy regional spend alongside its iron ore and nickel operations. For contractors and service providers, the scale of Indigenous and local sourcing points to strong demand for WA-based capability and joint ventures.

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers
    Mining
    about 7 hours ago

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers

    AIC Mines has closed a $70 million acquisition of Materra Metals, securing 100 per cent ownership of the Mt Cuthbert copper project in north‑west Queensland and adding 18.7 million tonnes of copper resources to its portfolio. The company plans a major drilling program in 2027, signalling a shift from resource consolidation to definition drilling and potential mine planning at Mt Cuthbert. For geotechnical and mine planners, the deal points to upcoming demand for pit design, hydrogeology, and infrastructure studies in a historically underdeveloped copper district.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental