Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Cat® Job Site Solutions at 20: contract metrics and design impacts for mine engineers

    December 23, 2025|

    Reviewed by Tom Sullivan

    Cat® Job Site Solutions at 20: contract metrics and design impacts for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Cat® Job Site Solutions is marking 20 years of performance-based support agreements that bundle equipment, technology and services into outcome-focused contracts for mines and quarries. Originating from a 2005 initiative to rethink customer support, the business now structures deals around metrics such as cost per tonne, fuel burn and availability, using tools like MineStar™ Fleet, condition monitoring and dealer-managed maintenance. For geotechnical and mining engineers, this shifts fleet planning and pit design decisions towards lifecycle cost, uptime guarantees and data-driven productivity baselines.

    Technical Brief

    • For future projects, outcome-based contracts are likely to influence early fleet selection and cut–fill sequencing decisions.

    Our Take

    Caterpillar’s Job Site Solutions milestone sits alongside several recent fleet deals in our database, such as Heavy Metal Equipment & Rentals’ plan to run 131 Cat 797s by end-2026, underscoring how miners are increasingly outsourcing not just machines but whole-of-fleet performance outcomes to OEM-linked service arms.

    The expansion of autonomous Cat MineStar Command trucks at Vale’s Northern System in Pará suggests that Job Site Solutions’ value proposition is likely shifting from pure productivity consulting towards integrating autonomy, data and life-cycle support into long-term site contracts.

    Within the 441 Mining stories and 868 tag-matched pieces in our coverage, Caterpillar features frequently in decarbonisation and automation pilots (for example BHP and Rio Tinto’s Early Learner 793 XE battery-electric trials), indicating that Job Site Solutions is operating in a client base that is already primed for technology-heavy, outcome-based agreements.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.