Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability

    Boliden Garpenberg hoist investment: design and energy notes for mine engineers

    March 19, 2026|

    Reviewed by Joe Ashwell

    Boliden Garpenberg hoist investment: design and energy notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Boliden is investing SEK 4 billion in a new hoist system at its Garpenberg Zn-Pb-Cu-Ag-Au mine to enable a shift from diesel truck ramp haulage to electric hoisting, cutting ramp traffic and power demand peaks while supporting deeper mining. A further SEK 1.5 billion will fund an industrial demonstration plant at the Rönnskär smelter to produce supplementary cementitious material from process residues, targeting partial clinker replacement in concrete. Together, the projects aim to improve unit earnings and reduce lifecycle emissions in both mining and downstream materials use.

    Technical Brief

    • Combined investments are framed as improving long‑term earnings capacity at both operations, not only emissions intensity.
    • Similar residue‑to‑SCM schemes at polymetallic smelters could materially alter tailings and landfill volumes if technically proven.

    Our Take

    The Garpenberg hoist and Rönnskär demonstration plant spend follows other Boliden capital directed at low‑carbon infrastructure, such as the Aitik tailings electrification and automation work with ABB reported in December 2025, signalling a coordinated upgrade of both mining and processing assets rather than isolated projects.

    In our database, Boliden features frequently in ‘Projects’ and ‘Sustainability’ coverage for power and fleet decarbonisation, including the Neves‑Corvo self‑consumption solar project and the roll‑out of “green fleets” across its European copper, nickel and zinc operations, so the Garpenberg hoist investment is likely part of a portfolio‑wide push to cut Scope 1 and 2 emissions.

    The scale of the 4 billion SEK hoist investment at Garpenberg, alongside 1.5 billion SEK at Rönnskär, suggests Boliden is betting on long mine and smelter life, which typically underpins decisions to commit to full electric haulage systems and deeper automation rather than incremental diesel‑based upgrades.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Top 50 mining companies add $250bn in 2026: capital and project signals for engineers
    Mining
    about 4 hours ago

    Top 50 mining companies add $250bn in 2026: capital and project signals for engineers

    Global mining majors added $250 billion in value in early 2026, lifting the MINING.COM Top 50 to a combined $2.41 trillion despite the US–Iran war and volatile gold at about $4,700/oz and silver above $70/oz, both off record spikes. BHP briefly exceeded a $200 billion market capitalisation, copper contributed $7.95 billion to its half‑year operating earnings, and six miners – including Agnico Eagle, Zijin Mining, Southern Copper and Newmont – now sit in the $100‑billion club. At the other end, Amman Minerals fell 27% on Indonesian smelter delays and Ivanhoe Mines cut Kamoa‑Kakula 2026 copper guidance to 290,000–330,000 tonnes, dropping it below the $18 billion Top 50 cut‑off.

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners
    Mining
    1 day ago

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners

    Canadian processor pH7 Technologies is expanding its Vancouver facility, backed by up to C$4 million from NRC IRAP, to scale its organo-electrochemical platform that recovers platinum, palladium and rhodium from secondary materials without toxic reagents or tailings wastewater. The commercial plant already processes spent catalytic converters, producing 30,000–40,000 oz of platinum-equivalent PGMs per year under a tolling and offtake model involving partners such as Mitsubishi. pH7 is now piloting electrochemically generated oxidants to heap leach chalcopyrite and other sulphide ores without cyanide, targeting on-site mine deployment within 1–2 years across South America, Africa and Australia.

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers
    Mining
    1 day ago

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers

    Dellner Bubenzer is supplying a wide range of industrial brakes and couplings for mining hoists, slewing drives and belt conveyors, developed in long-term collaboration with OEMs. The company focuses on both service and emergency braking solutions tailored to heavy-duty mining duty cycles and harsh environments, addressing controlled hoisting, precise slewing and high-tension conveyor stopping. For engineers, the key point is an integrated approach to drivetrain and braking design, rather than bolt-on safety systems, across multiple critical mining applications.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.