Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    BHP drops Anglo bid as Teck vote looms: planning implications for coal mine logistics

    November 24, 2025|

    Reviewed by Tom Sullivan

    BHP drops Anglo bid as Teck vote looms: planning implications for coal mine logistics

    First reported on MINING.com

    30 Second Briefing

    BHP has withdrawn its latest takeover proposal for Anglo American but maintains that a combination still offers strategic value, as Anglo shareholders prepare to vote on the $14.2bn sale of its 77% stake in Teck Resources’ steelmaking coal business. The Teck deal would transfer four British Columbia steelmaking coal mines and associated logistics to Glencore, Nippon Steel and POSCO, reshaping seaborne hard coking coal supply. For mine planners and bulk logistics teams, the outcome will influence long-term contracting, rail and port utilisation, and capital allocation across competing coal and copper assets.

    Technical Brief

    • Analysts flagged potential multi‑year integration and permitting timelines as a key transaction risk.
    • For long-life open pit coal and copper assets, ownership uncertainty complicates multi-decade mine planning and closure sequencing.

    Our Take

    The related 23 November piece on BHP’s earlier approach to Anglo and Teck’s US$53 billion merger vote underlines that this M&A move is tightly coupled to the future ownership and configuration of Teck’s asset base, rather than a standalone corporate tilt.

    Across the 30 Mining stories in our database, BHP appears frequently in litigation and legacy-risk contexts, such as the UK High Court ruling on the Fundão dam failure, which may indirectly shape how counterparties like Anglo and Teck assess transaction risk and deal protections.

    With 87 tag-matched pieces on Projects and Contract Award, this BHP–Anglo–Teck M&A situation stands out as one of the few items where project pipelines could be reshaped at portfolio scale, potentially affecting which development-stage assets advance or are divested post-transaction.

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sandvik mining talent report: key workforce design takeaways for engineers
    Mining
    about 7 hours ago

    Sandvik mining talent report: key workforce design takeaways for engineers

    New research from Sandvik’s global engineering group points to a shrinking pipeline of mining engineers, with survey data showing young professionals rank decarbonisation projects, automation and digital systems above traditional pit or plant roles. Respondents cited reluctance to work FIFO rosters and in remote camps, and a preference for hybrid city-based roles linked to remote operations centres and OEM technology hubs. Sandvik argues miners must redesign graduate pathways around battery-electric fleets, data analytics and equipment condition monitoring to compete with infrastructure, renewables and tech employers.

    Timken housed bearing units: reliability and maintenance gains for mine plant teams
    Mining
    about 8 hours ago

    Timken housed bearing units: reliability and maintenance gains for mine plant teams

    Timken is promoting a broad portfolio of housed bearing units for mining applications, including solid-block spherical roller units and split-block designs aimed at high-load, contaminated environments on conveyors, crushers and vibrating screens. The units typically integrate triple-lip or labyrinth seals, ductile iron or cast steel housings and factory-set clearances to cope with misalignment, shock loads and abrasive fines common in fixed plant. For maintenance teams, the focus is on longer relubrication intervals, reduced unplanned stoppages and easier swap-out in cramped, dirty locations.

    Rio Tinto renewable diesel trial: HVO fleet switch insights for mine engineers
    Mining
    about 8 hours ago

    Rio Tinto renewable diesel trial: HVO fleet switch insights for mine engineers

    Rio Tinto and Viva Energy have completed a large-scale renewable diesel trial, showing haul trucks and other heavy mobile equipment can switch from conventional diesel with no changes to engines, fuel systems or maintenance schedules. The trial used drop-in hydrotreated vegetable oil (HVO)-type fuel in standard high-horsepower mining fleets, validating cold-start performance, fuel consumption and engine wear against OEM limits. Results indicate sites with existing diesel storage and distribution can cut Scope 1 emissions from mobile equipment rapidly by substituting fuel rather than retrofitting fleets.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.