Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Baltic Wharf Bristol redevelopment: brownfield design notes for project teams

    November 26, 2025|

    Reviewed by Tom Sullivan

    Baltic Wharf Bristol redevelopment: brownfield design notes for project teams

    First reported on The Construction Index

    30 Second Briefing

    Work has started on Baltic Wharf in Bristol, where The Hill Group and Goram Homes will build 166 harbourside homes on a complex brownfield site on Spike Island, backed by a £2.4m Brownfield Land Release Fund grant. The scheme delivers 66 affordable units owned by Sovereign Network Group, including 50 for social rent and 16 for shared ownership, giving a 40% affordable housing mix. Plans also reopen a previously restricted waterfront, reconnecting the River Avon to the Floating Harbour with new pedestrian links, public realm, café and flexible commercial space, with first homes due spring 2027.

    Technical Brief

    • Brownfield Land Release Fund is contributing £2.4m via the national One Public Estate programme.
    • Hill Group is delivering the scheme in partnership with Goram Homes, Bristol City Council’s house-building company.
    • Sovereign Network Group will own and manage all 66 affordable units within the mixed-tenure block configuration.
    • Site lies on Spike Island, requiring integration with existing harbour structures and constrained waterfront geometry.
    • Reconnection of the River Avon to the Floating Harbour demands careful hydraulic, flood risk and bank stability design.
    • New pedestrian links and public realm introduce additional loading, access and safety constraints along the quay edge.
    • Café and flexible commercial spaces require separate servicing, fire strategy and acoustic treatment from residential elements.
    • Example of complex inner-city brownfield regeneration where housing, public realm and waterfront engineering are tightly interdependent.

    Our Take

    Within the 58 Infrastructure stories in our database, few UK schemes match Baltic Wharf’s 40% affordable housing share, which signals Bristol City Council and Goram Homes are pushing the upper end of viability expectations for mixed-tenure waterfront sites.

    The £2.4m Homes England/One Public Estate brownfield land release grant suggests the ground conditions at Baltic Wharf are likely to involve abnormal remediation or enabling costs that would otherwise undermine the 166-unit density on a constrained harbourside plot.

    For contractors and consultants, a spring 2027 horizon on a central Bristol brownfield like Baltic Wharf implies tight programming around existing quay structures and utilities, a pattern seen across other urban UK regeneration schemes in our infrastructure coverage.

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Kingsley Roofing £16,650 fall fine: work-at-height lessons for site engineers
    Infrastructure
    about 4 hours ago

    Kingsley Roofing £16,650 fall fine: work-at-height lessons for site engineers

    A Northampton roofing contractor has been fined £16,650 after a 31-year-old employee fell more than three metres through an uncovered skylight opening while re-covering a single-storey flat roof on Sywell Road, suffering injuries requiring surgery and long-term treatment. Health & Safety Executive investigators found Kingsley Roofing Contractors Limited had not properly planned work at height or installed effective fall-prevention measures around two large skylight openings. The firm pleaded guilty to breaching Section 3(1) of the Health and Safety at Work etc Act 1974 and was ordered to pay £7,205 in costs plus a £2,000 victim surcharge.

    Mace accelerates Paddington over-station development: delivery and design notes for engineers
    Infrastructure
    about 5 hours ago

    Mace accelerates Paddington over-station development: delivery and design notes for engineers

    Mace will start main works in early 2025 on Helical’s £200m, 235,000 sq ft over-station office scheme above Paddington station, a 19-storey Grimshaw-designed canalside building with 15 office floors and ground-floor retail, now targeting completion in Q3 2028 instead of Q4 2028. Preparatory works are already under way ahead of formal site acquisition in January 2026, with Helical developing the project in joint venture with Places for London. Helical has also agreed heads of terms for forward funding a 429-studio student block above Southwark Tube and forward sale of 44 affordable homes to Southwark Council, with construction planned from H1 2026 to 2029.

    Tilbury Douglas Coventry diagnostic centre: design and delivery notes for engineers
    Infrastructure
    about 5 hours ago

    Tilbury Douglas Coventry diagnostic centre: design and delivery notes for engineers

    Tilbury Douglas has begun a £14m project to convert an existing building in Coventry into a community diagnostic centre (CDC) for NHS Property Services and University Hospitals Coventry & Warwickshire NHS Trust. The facility, located near the Coventry Urgent Treatment Centre, GP practices and mental health services, is designed to handle around 90,000 patients annually and deliver up to 75,000 additional diagnostic tests a year for conditions including cancer and heart disease. Opening is targeted for late 2026, with a brief for a modern, energy-efficient healthcare facility.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy