Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    B2Gold’s Johnson: Goose and Fekola mine plans – key takeaways for engineers

    December 26, 2025|

    Reviewed by Tom Sullivan

    B2Gold’s Johnson: Goose and Fekola mine plans – key takeaways for engineers

    First reported on MINING.com

    30 Second Briefing

    B2Gold is closing 2025 with commercial production at the Goose mine in Nunavut, targeting 4,000 tonnes per day and about 300,000 oz. gold annually, while maintaining Fekola output in Mali at 515,000–550,000 oz. under a split open-pit/underground plan. CEO Clive Johnson is leveraging his Bema Gold experience in remote Russia to manage Goose’s long, seasonal ice-road supply chain and complex permitting under Mali’s 2023 mining code for trucking satellite ore to the Fekola mill. Additional growth options include the Antelope underground discovery at Otjikoto in Namibia (1.75 Mt at 6.91 g/t for ~390,000 oz.) and a 9.9% strategic stake in Snowline Gold’s Valley project in the Yukon.

    Technical Brief

    • Johnson reports ramp-up challenges centred on achieving planned mining rates, accessing modelled grades and tuning the new mill.

    Our Take

    Within our 452 Mining stories, B2Gold appears frequently as one of the few mid-tier gold producers with multi-continent exposure (Mali, Namibia, Philippines, Canada), which tends to give it more optionality in reallocating capital when a single jurisdiction tightens its mining code.

    The 6.91 g/t inferred grade at Antelope’s Springbok zone in Mali is high relative to many open-pit gold projects in our database, suggesting that even under a less favourable 2023 code regime, selective development of such zones could still clear economic hurdles at current gold prices.

    Masbate’s 0.88 g/t feed grade combined with 2.17 Mt quarterly throughput in the Philippines fits a pattern in our gold coverage where operators are leaning on large, lower-grade mills to maintain ounce profiles while higher-grade satellite deposits (like Antelope) are advanced to protect margins.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Historic gold, silver price rally: project economics lens for mine planners
    Mining
    about 7 hours ago

    Historic gold, silver price rally: project economics lens for mine planners

    Gold, silver and platinum hit fresh records on Friday, with spot gold touching $4,540/oz, February Comex futures peaking at $4,584/oz and March silver futures jumping over 9% to $78.30/oz, as palladium surged 13% to above $2,000/oz. Gold is heading for a >70% annual gain, driven by robust central bank buying and ETF inflows, including SPDR Gold Shares (GLD) increasing its holdings by more than 20% and physically backed funds taking in $82 billion (749 tonnes) by 22 December. Silver has rallied 160% in 2025 amid an October short squeeze, ongoing supply dislocations between London and New York vaults, and a pending US Commerce Department probe that could impose tariffs or trade restrictions.

    New York copper price surge and Shanghai record: supply shocks explained for mine planners
    Mining
    about 8 hours ago

    New York copper price surge and Shanghai record: supply shocks explained for mine planners

    Copper prices surged again on Friday, with London Metal Exchange contracts hitting a record $12,282/t before the Christmas break and Shanghai Futures Exchange prices briefly touching 100,000 yuan/t (~$14,270/t), creating a sharp premium over New York. Comex March copper climbed more than 5% to $5.903/lb (~$13,000/t), its highest since July’s short squeeze, as 2025 production was hit by accidents at Grasberg, Kamoa-Kakula and Codelco’s El Teniente. BMO now projects an average $12,500/t by Q2 2026, while Goldman Sachs still sees a 160 kt surplus capping prices at $10,000–$11,000/t.

    Iamgold’s Lemelin and Côté Gold: production, AISC and expansion notes for engineers
    Mining
    about 15 hours ago

    Iamgold’s Lemelin and Côté Gold: production, AISC and expansion notes for engineers

    Iamgold COO Bruno Lemelin, named Northern Miner Group’s EY Operator of the Year, has led the Côté open-pit mine in Ontario to commercial production at its 36,000 t/d plant, drawing on 233 Mt at 0.96 g/t for 7.17 Moz over an 18-year life and targeting average output of 365,000 oz/y. Third-quarter production reached 106,000 oz from Côté, Essakane (92,000 oz) and Westwood (23,000 oz), generating US$707 million revenue at an average realised gold price of US$3,492/oz and AISC of US$1,956/oz. Expansion work includes 55 km of drilling at the adjacent Gosselin deposit (4.4 Moz indicated, 3 Moz inferred) to test a “super-pit” concept lifting throughput from 13 Mt/y to up to 20 Mt/y, while Essakane life extension drilling proceeds under Burkina Faso’s tougher 2024 mining code and Côté ramps autonomous haulage and AI-enabled control-room operations.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.