Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Product
    Projects

    Atlas Copco DrillAir Y1260 in pit-to-plant service: efficiency notes for mine engineers

    February 15, 2026|

    Reviewed by Joe Ashwell

    Atlas Copco DrillAir Y1260 in pit-to-plant service: efficiency notes for mine engineers

    First reported on Australian Mining

    30 Second Briefing

    Atlas Copco Rental Australia’s DrillAir Y1260 compressor is being deployed as a single air source from drill pad to processing plant, replacing multiple smaller units across blasthole drilling, dewatering and plant air services. The high-pressure, high-flow package is containerised for rapid relocation in-pit and around fixed infrastructure, with integrated fuel management and remote monitoring to optimise load profiles. For mine operators, the approach concentrates maintenance on one large unit, simplifies air distribution design and can cut diesel consumption and unplanned downtime across the pit-to-plant circuit.

    Technical Brief

    • Similar pit-to-plant air strategies could rationalise diesel-powered compressor fleets on other multi-pit operations.

    Our Take

    Atlas Copco product pieces in our Mining coverage often sit at the interface of ‘Product’ and ‘Projects’, signalling that OEMs are increasingly marketing compressors like the DrillAir Y1260 as project-enabling infrastructure rather than standalone hire gear in Australia.

    Within the 1034 Mining stories in our database, Australia frequently appears where temporary or rental plant is used to de‑risk early works and brownfield upgrades, so a high-capacity compressor such as the Y1260 is likely being positioned to support short‑duration drilling or dewatering campaigns without committing to full capex.

    Across other product-focused items, high-output air systems are commonly tied to claims of fuel or power efficiency; for Atlas Copco Rental Australia this typically translates into a pitch around lowering operating costs and emissions intensity on remote sites where grid power is constrained.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 12 hours ago

    SME MINEXCHANGE 2026 awards: practice benchmarks and signals for mining engineers

    The MINEXCHANGE 2026 SME Annual Conference & Expo in Salt Lake City will close next week with SME’s Signature Awards Event recognising more than 70 recipients across mining, metallurgy and exploration. Honours span technical excellence, health and safety, environmental stewardship and professional service, reinforcing SME’s role in setting practice benchmarks for US and international operations. For engineers and operators, the awards list often signals emerging leaders, influential research directions and projects likely to shape upcoming guidance and conference content.

    Mining
    about 12 hours ago

    Gekko In Line Pressure Jigs at Hemerdon: flowsheet implications for process engineers

    Tungsten West has appointed Duo Group as EPC contractor for a new-build crushing, screening and ore sorting plant at the Hemerdon tungsten-tin mine in Devon, and signed an agreement to deploy Gekko Systems’ In Line Pressure Jigs in the flowsheet. The project centres on upgrading run-of-mine ore through pre-concentration and sensor-based sorting ahead of jig-based gravity recovery, aiming to improve tungsten and tin yield from the existing open-pit resource. For process engineers, the move signals a flowsheet shift towards higher early-stage rejection of waste and lower downstream milling load.

    Mining
    about 14 hours ago

    ESCO Nexsys Ripper System: productivity and wear-life notes for mine planners

    ESCO’s ESCO division has launched the Nexsys Ripper System for Cat D11 dozers, targeting high-load ripping in mining, aggregate and heavy construction applications. The system uses premium alloy steels and a redesigned shank–tooth interface to improve penetration and wear life under highly abrasive conditions typical of large open pits and quarries. Faster tooth changes and reduced unplanned change-outs are aimed at increasing dozer utilisation on primary ripping benches and hard overburden, with direct implications for drill-and-blast requirements and fleet productivity.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.