Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Allison–Dana off-highway acquisition: drivetrain integration notes for mine fleets

    January 2, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Allison Transmission has completed its US$2.7 billion acquisition of Dana Incorporated’s Off-Highway Drive & Motion Systems business, consolidating axles, drivelines and advanced propulsion systems for mining and construction equipment under one supplier. The deal folds Dana’s off-highway product lines, including heavy-duty drive and motion systems for rigid dump trucks and large wheel loaders, into Allison’s existing transmission and hybrid/electric portfolio. For mine operators and OEMs, this signals tighter integration between transmissions, drivetrains and electrified propulsion packages for high-tonnage haulage and loading fleets.

    Technical Brief

    • Acquisition price is approximately US$2.7 billion, indicating a large-scale consolidation of off-highway powertrain assets.
    • Dana’s Off-Highway Drive & Motion Systems business was a core supplier of drivetrain and propulsion solutions.
    • Scope includes mechanical drivetrains and advanced propulsion technologies, not just discrete axle or transmission components.
    • Integration creates a single engineering chain from torque input to wheel interface for heavy off-highway machines.
    • Combined portfolio targets high-duty-cycle environments such as mining haulage, quarrying and large construction earthmoving.
    • For OEM design teams, a unified supplier simplifies packaging studies, interface management and validation of complete driveline systems.
    • At industry level, the deal continues a pattern of tier‑one consolidation in off‑highway powertrain supply.

    Our Take

    A US$2.7 billion off-highway M&A deal is at the upper end of transaction sizes in our mining equipment coverage, signalling that drivetrain and motion systems are being treated as core strategic assets rather than bolt-on product lines.

    For mine operators, consolidation of drivetrain suppliers around players like Allison Transmission Holdings typically leads to tighter integration between engines, transmissions and electrified drivetrains, which can simplify fleet standardisation but may reduce bargaining power on pricing and support.

    Within our 905 tag-matched pieces on Projects and Product, most equipment news is about incremental model updates; a transaction of this scale suggests OEMs are repositioning entire portfolios ahead of wider adoption of hybrid and fully electric off-highway haulage systems.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mulberry–Ramaco Brook mine rare earth MoU: supply and processing notes for engineers
    Mining
    about 11 hours ago

    Mulberry–Ramaco Brook mine rare earth MoU: supply and processing notes for engineers

    Mulberry Industries has signed a non-binding offtake MoU with Ramaco Resources for customised rare earth oxide blends from the Brook mine in Wyoming, billed as the United States’ first new rare earth and critical mineral mine in more than 70 years and sourced from coal and carbonaceous ore. Ramaco has begun full-scale mining and is building a pilot processing plant to supply oxides including samarium, NdPr, yttrium, gallium and Dy/Tb on a non-exclusive basis. Mulberry will use the domestic feed to supplement its 10-year stockpile for NdFeB, SmCo and AlNiCo magnet production at its Georgia plant for defence, aerospace, automotive and robotics customers.

    US titanium capacity squeeze: supply-chain and project signals for engineers
    Mining
    about 12 hours ago

    US titanium capacity squeeze: supply-chain and project signals for engineers

    Western aerospace manufacturers are forecast to need 1.6 million tonnes of titanium by 2044, yet the US has no domestic sponge production since the Henderson, Nevada plant closed in 2020 and now relies on imports from Russia- and China-dominated supply chains, where China’s share of titanium metals has surged from 40% in 2019 to over 75% in 2025. Project Blue’s Nils Backeberg notes US ilmenite and rutile mining is largely tied to TiO₂ pigment, not aerospace-grade metal, making new melt and sponge capacity critical. Timet is responding with an $868 million, 500,000 sq ft “Project Aero” titanium melt/rolling facility in North Carolina (target 2027), a new microgrid-powered melt plant in West Virginia, and an 8,500 t/y electron-beam ingot expansion in Pennsylvania, signalling tighter qualification and sourcing pressures for defence and aviation programmes.

    Ivanhoe Mines’ Congo smelter start-up: production and recovery notes for engineers
    Mining
    about 17 hours ago

    Ivanhoe Mines’ Congo smelter start-up: production and recovery notes for engineers

    Ivanhoe Mines has started copper anode production at the Kamoa-Kakula direct-to-blister smelter in the DRC, a 500,000 tpa facility targeting 99.7%-pure anodes and an overall copper recovery of 98.5%, with first output achieved on 29 December, about five weeks after heat-up. The smelter is being ramped to handle concentrates from the Phase 1–3 concentrators, with 2026 mine output guided at 380,000–420,000 tonnes of copper and on-site concentrate inventories cut from 37,000 to about 17,000 tonnes. Stage 2 dewatering of the earthquake-flooded Kakula mine is complete, selective mining has restarted, and Stage 3 pump-station recommissioning is planned through Q2 2026 without constraining production.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy