Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Safety
    Projects

    AGS Chair’s blog March 2025: safety, EC7 ground models and CPD notes for engineers

    November 21, 2025|

    Reviewed by Joe Ashwell

    AGS Chair’s blog March 2025: safety, EC7 ground models and CPD notes for engineers

    First reported on AGS (UK) – Blog/Magazine

    30 Second Briefing

    AGS’s March issue centres on women’s safety and wellbeing in geotechnics, including profiles of SiLC’s female leads and reflections on basic PPE gaps such as safety boots not available in smaller sizes. Technical content covers EC7-compliant ground model construction, Net Zero-focused rolling dynamic compaction, and current constraints in professional indemnity insurance identified by the Loss Prevention Working Group. Forthcoming CPD includes an April webinar on effective procurement of ground investigations and a May in-person Annual Conference themed “The Future”, with an early-career workplace innovation poster competition and networking reception.

    Technical Brief

    • Safety footwear sizing is flagged as a persisting hazard control gap for women on geotechnical sites.
    • International Women’s Day on 8 March is used as a focal date for safety culture reflection.
    • SiLC’s female leads are profiled to link senior professional accreditation with inclusive site safety leadership.
    • EC7-compliant ground model construction is framed as a prerequisite for reliable geotechnical design risk assessment.
    • Rolling dynamic compaction is discussed in the context of carbon reduction while maintaining ground improvement performance.
    • Professional indemnity insurance constraints are tied to recent AGS member survey responses on risk allocation.
    • An April webinar targets procurement of ground investigations as a lever for improving safety-critical data quality.
    • The May in-person Annual Conference adds a workplace innovation poster competition to surface practical safety improvements.

    Our Take

    AGS Magazine appears only sparingly in our Geotechnical coverage, so a Chair’s blog framed around Safety and Projects will likely shape how many UK ground engineering practitioners interpret current good practice rather than just reporting it.

    With Safety and Projects tags among 31 tag-matched pieces, this blog gives the Loss Prevention Working Group a relatively prominent platform compared with most technical notes, signalling that procedural and behavioural risk management are becoming as visible as design methods in our recent geotechnical items.

    The timing around 8 March and a time horizon of April–May suggests AGS and SiLC are using the Chair’s blog as a soft policy lever ahead of the main spring conference and CPD season, when many UK consultants and contractors lock in training and project protocols for the year.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Quaise superhot geothermal plant: design and subsurface risks for engineers
    Geotechnical
    3 days ago

    Quaise superhot geothermal plant: design and subsurface risks for engineers

    Quaise Energy is advancing Project Obsidian in Oregon, aiming to build the first superhot geothermal plant by drilling into rock above 300°C and delivering a baseload 50 MW from only a handful of wells by 2030. A modelling analysis presented at the 2026 Stanford Geothermal Workshop by senior mechanical engineer Daniel W. Dichter indicates higher subsurface temperatures could ultimately support 250 MW in phase two, with a regional goal of 1 GW. The confirmation well is due online later this year, with lab work at Oregon State University recreating extreme downhole geochemical conditions.

    Keller North America leadership changes: procurement and delivery notes for engineers
    Geotechnical
    10 days ago

    Keller North America leadership changes: procurement and delivery notes for engineers

    Keller has appointed Scott Nichols as President of Keller North America and promoted Curtis Cook to President of its US Foundations business unit, reshaping leadership at one of the region’s largest geotechnical contractors. Nichols will oversee a portfolio spanning ground improvement, grouting, deep foundations and earth retention across Canada, the United States and Mexico, while Cook will focus on US piling and shoring operations. The changes signal continuity of in-house leadership and may influence procurement, partnering and design–build delivery on major foundation and ground engineering projects.

    Keller and Michael Speakman: leadership legacy and lessons for ground engineers
    Geotechnical
    16 days ago

    Keller and Michael Speakman: leadership legacy and lessons for ground engineers

    Former Keller Group chief executive Michael Speakman has died, with the ground engineering contractor announcing his death on 9 April following his passing last week. Speakman led Keller, one of the world’s largest specialist geotechnical contractors with operations across piling, ground improvement and grouting, through a period of major infrastructure delivery in transport, energy and urban development. His death removes a senior industry figure with deep experience in large-diameter piling, complex ground stabilisation and international project delivery.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental