Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability

    ABx Tasmanian rare earths heap leach: process and capex notes for mine planners

    December 19, 2025|

    Reviewed by Joe Ashwell

    ABx Tasmanian rare earths heap leach: process and capex notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Early testwork at ABx Group’s Deep Leads ionic adsorption clay rare earths project in northern Tasmania indicates that low-acid, ambient-temperature heap leaching may be technically viable, offering a simpler alternative to conventional tank leach circuits. Column leach trials on bulk samples are being used to assess percolation, recovery and impurity deportment, with a focus on desorption of magnet rare earths such as neodymium and praseodymium. If scaled, the approach could reduce reagent consumption, cut capital tied up in agitated tanks, and suit shallow, free-dig clay deposits typical of the licence area.

    Technical Brief

    • Rare earths are dominantly adsorbed onto clay surfaces rather than locked in resistant primary minerals.
    • Free-dig, soft clay profile reduces or eliminates drill-and-blast, favouring simple truck–shovel extraction.
    • ABx is evaluating in-situ permeability and clay swelling behaviour to maintain heap percolation pathways.
    • Process design must manage fine-particle migration and potential slumping in stacked clay heaps under rainfall.

    Our Take

    Rare earths pieces in our database often centre on hard-rock deposits in Western Australia and Queensland, so ABx Group’s work in northern Tasmania suggests a diversification of Australia’s rare earths footprint into clay- or weathered-style systems that can have different processing and environmental profiles.

    Among the 785 Projects/Sustainability-tagged items, few combine rare earths with a Tasmanian setting, which likely means ABx’s Deep Leads project will be watched closely as a test case for how the state’s permitting and community expectations handle critical minerals developments.

    With only 20 rare-earths keyword matches across 388 Mining stories, ABx Group is operating in a relatively small but strategically important niche in our coverage, where demonstration of lower-impact extraction routes can materially influence how financiers and offtakers view Australian supply options.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.