Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    ABB GenAI in energy management: load and emissions insights for mine teams

    March 30, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    ABB has integrated its ABB Ability Industrial Knowledge Vault generative AI with the ABB Ability Energy Management System, allowing plant teams in sectors including mining to query energy and sustainability data via natural language rather than fixed dashboards. The system sits on top of existing EMS analytics and reporting, pulling from historical and real-time data to generate on-demand insights, summaries and explanations. For mines running complex power mixes and demand-response contracts, this could shorten decision cycles for load shifting, peak shaving and emissions reporting without reconfiguring SCADA or historian setups.

    Technical Brief

    • For other industrial users, ABB frames the tool as a way to reduce manual spreadsheet-based energy reconciliations.

    Our Take

    Taken together with ABB’s recent Automation Extended initiative and the System 800xA 7.0 release, this GenAI layer suggests a roadmap where existing ABB Ability users in concentrators, refineries and smelters can bolt on AI-assisted optimisation without wholesale DCS replacement.

    With over 1700 AI- or artificial intelligence-tagged mining pieces logged, ABB’s integration of GenAI into ABB Ability positions it among a small group of OEMs trying to monetise AI primarily through energy-efficiency and sustainability use cases, rather than just predictive maintenance add-ons.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 7 hours ago

    Aggreko on energy security for African mines: hybrid power design notes for engineers

    Brent crude jumping from $92 to over $113 per barrel in a single week is used by Edith Kikonyogo, Managing Director of Aggreko Africa, to argue that African mines should cut exposure to fuel price volatility by shifting from pure thermal generation to hybrid power. She points to integrating diesel or HFO with solar PV, battery energy storage systems and, where available, grid connections to stabilise costs and improve supply resilience. For mine planners and power engineers, the message is to design modular, multi-source plants rather than locking into single-fuel genset fleets.

    Mining
    about 11 hours ago

    Liebherr R 9100 G8 mining excavator: fleet planning and parts strategy notes

    Liebherr’s new 100 t R 9100 G8 mining excavator is moving into series production after pre‑series field validation and will replace the previous R 9100 G6 in the company’s 100 t class. The OEM is targeting the same deployment envelope as the G6 fleet while offering an updated eighth‑generation (G8) platform that standardises components with larger Liebherr mining excavators. For mine planners and maintenance teams, the key implication is a drop‑in successor for existing 100 t fleets with improved parts commonality and lifecycle support.

    Mining
    about 11 hours ago

    Metso’s VSF SX-EW plants for Tia Maria: flowsheet implications for mine engineers

    Metso has signed a major agreement to supply its VSF solvent extraction and electrowinning (SX-EW) technology to Southern Peru Copper Corporation’s Tia Maria greenfield project in Cocachacra, Arequipa. The SX-EW plant is designed to produce 120,000 t/y of high-purity copper cathode, using Metso’s modular VSF cells and integrated electrowinning circuits. For process and project engineers, the deal signals a commitment to heap leach–SX-EW flowsheets at Tia Maria rather than conventional concentrator–smelter routes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.