    A35 Dorset £1.8M safety upgrade: design and traffic management notes for engineers

    January 28, 2026|

    Reviewed by Tom Sullivan

    A35 Dorset £1.8M safety upgrade: design and traffic management notes for engineers

    First reported on New Civil Engineer

    30 Second Briefing

    National Highways has started a £1.8M safety upgrade on a 42km single-carriageway section of the A35 in west Dorset, targeting a corridor with a history of serious collisions and speed-related incidents. Measures will focus on speed reduction and driver guidance, typically involving average speed cameras, improved signing and lining, and localised junction treatments on rural curves and undulating gradients. For designers and contractors, the works will require careful traffic management on a strategic trunk route with constrained verges and limited diversion options.

    Technical Brief

    • Rural cross-section with constrained verges limits options for physical segregation or substantial widening-based countermeasures.
    • Undulating topography and horizontal curvature require careful placement of enforcement and guidance measures to avoid sightline issues.
    • Likely night-time and off-peak working windows will drive traffic management phasing and temporary safety controls.
    • Interfaces with side-road and farm accesses will need bespoke signing and temporary speed management to avoid rear-end shunts.
    • Drainage features and soft verges along the corridor will influence safe positioning of new roadside assets and cabinets.
    • For similar rural trunk routes, low-cost corridor-wide treatments offer a template where full reconstruction is unaffordable.

    Our Take

    Within our 558 Infrastructure stories, National Highways features most often in higher-value upgrades, so a £1.8M package on a single 42km corridor in Dorset signals that this stretch of the A35 is being treated as a priority risk location rather than a routine maintenance job.

    Among the 1,528 Projects/Safety-tagged pieces, rural A‑roads in the United Kingdom like this west Dorset section typically see incremental, multi-phase interventions; practitioners should expect follow-on schemes or speed management changes if collision data do not improve after this initial works programme.

    For local authorities and contractors in Dorset, a safety-focused scheme of this scale on a strategic route often acts as a reference project, shaping design standards and preferred treatments for similar hazard-prone corridors across the region.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 9 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 8 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.