Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalInfrastructureHazardsEnvironmental
    Homes England, Hill Group Cambridge East deal: infrastructure lens for engineers
    Infrastructure
    2 months ago

    Homes England, Hill Group Cambridge East deal: infrastructure lens for engineers

    Homes England’s Cambridge Growth Company and The Hill Group have acquired the 700‑acre Cambridge East site, including Cambridge City Airport, to deliver more than 10,000 homes and at least 3 million sq ft of commercial space supporting around 9,000 jobs. Marshall Group will relocate airport operations by mid‑2029, clearing the way for a large mixed‑use urban extension with schools, healthcare facilities, extensive public green space and a potential regional construction training hub. The scheme is expected to be served by the proposed Cambridge East station, improving rail links to central Cambridge, London, Bedford and Oxford.

    HyKit hydrogen bowsers and ‘shipping sunlight’: practical notes for site engineers
    Infrastructure
    2 months ago

    HyKit hydrogen bowsers and ‘shipping sunlight’: practical notes for site engineers

    HyKit has launched its first mobile hydrogen refueller – a trailer‑mounted “hydrogen bowser” – aimed at supplying fuel to off‑grid construction sites and plant. Executive chair Jo Bamford outlines plans for a global hydrogen supply chain spanning production, compression and on‑site dispensing, targeting heavy equipment such as excavators, generators and site vehicles. For contractors, the concept removes dependence on fixed refuelling stations and opens a pathway to trial hydrogen plant on existing projects without major infrastructure works.

    Tas Gov Ridgley Highway upgrade plan: design and risk notes for road engineers
    Infrastructure
    2 months ago

    Tas Gov Ridgley Highway upgrade plan: design and risk notes for road engineers

    Tasmania’s government has released a safety and efficiency upgrade strategy for the Ridgley Highway, the key freight corridor linking Burnie to the Murchison Highway and serving mining, forestry and tourism traffic on the state’s northwest–west coast route. The plan targets a documented crash cluster along the corridor and will prioritise treatments such as intersection upgrades, shoulder widening and improved delineation on high‑risk curves. For civil and geotechnical designers, the works will likely involve pavement strengthening, drainage improvements and slope stability checks on constrained rural sections.

    ProTx Arresta 100 vehicle arrestor: design and safety notes for roadwork engineers
    Infrastructure
    2 months ago

    ProTx Arresta 100 vehicle arrestor: design and safety notes for roadwork engineers

    Queensland manufacturer ProTx has launched the Arresta 100, claimed as the first purpose-built vehicle arrestor specifically for temporary static roadworks, with a live demonstration at Brisbane’s Advanced Robotics Manufacturing Hub. The system is designed to rapidly slow or stop out-of-control or unauthorised vehicles entering work zones, providing a physical barrier where conventional cones and signage offer limited protection. For road and civil contractors, it signals emerging options for engineered temporary traffic control hardware beyond standard crash cushions and water-filled barriers.

    Benestad–Nexans connector for floating wind: design and layout notes for engineers
    Infrastructure
    2 months ago

    Benestad–Nexans connector for floating wind: design and layout notes for engineers

    A new DNV-approved subsea connector from Benestad and Nexans targets faster, safer connection of dynamic power cables for floating offshore wind farms in open sea conditions. The wet-mateable, high-voltage unit is designed for repeated connection and disconnection without cable cutting, reducing offshore vessel time and exposure of technicians to heavy lifts and harsh weather windows. For geotechnical and offshore designers, the technology could ease maintenance strategies, simplify array reconfiguration, and influence layout decisions for deep-water floating foundations.

    Lachlan Valley Way safety works: design and delivery notes for road engineers
    Infrastructure
    2 months ago

    Lachlan Valley Way safety works: design and delivery notes for road engineers

    Work will start next week on $1.1 million of safety upgrades to New South Wales’ Lachlan Valley Way between the Hume Highway and Cowra, adding to more than $2 million of recent works on this freight and regional access corridor. Existing measures already delivered or underway include 18 kilometres of safety barriers and 80 kilometres of other treatments along the route, aimed at reducing run-off-road and head-on crashes. For designers and contractors, the programme signals continued demand for barrier installation, shoulder treatments and roadside hazard management on rural state roads.

    Flinders Highway resilience upgrade: drainage and pavement lessons for engineers
    Infrastructure
    2 months ago

    Flinders Highway resilience upgrade: drainage and pavement lessons for engineers

    Resilience investment from the Federal and Queensland governments will upgrade the Flinders Highway, the 780‑kilometre freight and tourism corridor linking Townsville to Cloncurry in north‑west Queensland. Works will focus on strengthening pavement layers and improving culverts and surface drainage to keep the route open during heavy rainfall and flooding, a recurring issue on this inland supply line. For mining and agricultural operators moving bulk product to the Port of Townsville, more reliable all‑weather access should reduce detours, travel time variability and pavement damage from heavy vehicles.

    LDD 360 for sub-£1m schemes: delivery model and risk notes for project teams
    Infrastructure
    2 months ago

    LDD 360 for sub-£1m schemes: delivery model and risk notes for project teams

    LDD Construction has launched LDD 360, a fully integrated delivery service for projects up to £1m, bundling strip-out, BWIC, structural steel, feature staircases and firestopping under a single management team led by Danny Huggins. The model replaces multiple trade contractors with one point of contact, aiming to cut programme risk from interface clashes, coordination gaps and duplicated preliminaries on smaller schemes. For civil and structural teams, this could simplify sequencing around steelwork, firestopping and builders’ work, but concentrates responsibility for quality and temporary works in one supplier.

    LGH Full Rental Partner in the UK: lifting safety and LOLER notes for project teams
    Infrastructure
    2 months ago

    LGH Full Rental Partner in the UK: lifting safety and LOLER notes for project teams

    Lifting gear specialist LGH has rolled out its ‘Full Rental Partner’ programme across Europe, giving contractors wider access to certified hoists, spreader beams and rigging hardware without capital purchase. In the UK, LGH has partnered with Plant and Safety Ltd to bundle equipment hire with on-site inspection, LOLER-compliant testing and operator training. The move targets projects needing short- to medium-term lifting solutions, where rapid mobilisation and documented safety assurance are critical for cranes, temporary works and heavy plant handling.

    Pulse Consult Tamworth win: QS and risk lessons for heritage project teams
    Infrastructure
    2 months ago

    Pulse Consult Tamworth win: QS and risk lessons for heritage project teams

    Pulse Consult has secured appointment to deliver quantity surveying and commercial management for the restoration of Tamworth Council’s historic premises, working alongside principal contractor Messenger for Tamworth Borough Council. The commission covers cost control, contract administration and commercial risk management on the heritage refurbishment, where fabric conservation and structural repairs must be tightly managed against budget. For contractors and consultants, the project signals continued demand for specialist QS capability on complex local authority restoration schemes.

    Murphy record order book: delivery, safety and skills insights for project teams
    Infrastructure
    2 months ago

    Murphy record order book: delivery, safety and skills insights for project teams

    Murphy reported record 2025 results, with revenue up 13% to £1.58bn, operating profit up 8% to £86.1m and a record £8.17bn order book spanning the UK, Ireland and North America. The contractor expanded its workforce 16% to 4,709 staff, invested £6.54m in training and cut its Lost Time Injury Frequency Rate to 0.06 over 22.6 million hours worked, a 65% reduction in five years. Internationally, Murphy took a 40% stake in Australia’s Abergeldie Complex Infrastructure and delivered Beaulieu Park station ahead of schedule.

    AtkinsRéalis Belfast Rapid Transit Phase 2: design and phasing notes for engineers
    Infrastructure
    2 months ago

    AtkinsRéalis Belfast Rapid Transit Phase 2: design and phasing notes for engineers

    Northern Ireland’s Department for Infrastructure has appointed AtkinsRéalis to deliver engineering services for Belfast Rapid Transit Phase 2, covering preliminary design, detailed design and construction supervision. The commission spans route alignment, civil and structural works, traffic and junction layouts, and integration of bus rapid transit infrastructure with existing urban roads. For contractors and designers, the appointment signals early definition of corridor geometry, utilities interfaces and construction phasing, which will shape tender requirements and buildability across the next stage of Belfast’s segregated transit network.

    Geobear appoints COO: implications for resin injection on live infrastructure
    Infrastructure
    2 months ago

    Geobear appoints COO: implications for resin injection on live infrastructure

    Ground engineering specialist Geobear has appointed Rupert Lee as chief operating officer to drive growth in its resin injection and ground stabilisation services for infrastructure and property assets. Lee brings strategy and operations experience from McKinsey & Company and subsequent private equity consultancy, signalling a push towards more data-driven performance management and scalable delivery models. For geotechnical contractors and asset owners, this may translate into wider deployment of non-disruptive ground improvement techniques on live rail, road and building projects.

    Scotland’s role in the £105bn net zero economy: project signals for engineers
    Infrastructure
    2 months ago

    Scotland’s role in the £105bn net zero economy: project signals for engineers

    Scotland delivers the highest value within the UK’s £105bn net zero economy, with major contributions from low‑carbon power, onshore and offshore wind, and grid infrastructure upgrades. Regional clusters in the Midlands and Yorkshire also rank strongly, driven by clean manufacturing, hydrogen pilots and industrial decarbonisation projects around existing heavy industry hubs. For civil and geotechnical engineers, this signals continued demand for large‑scale energy infrastructure, port upgrades for offshore wind, and brownfield industrial retrofits in these regions.

    Sweco–Platom acquisition: nuclear project design implications for engineers
    Infrastructure
    2 months ago

    Sweco–Platom acquisition: nuclear project design implications for engineers

    Sweco has agreed to acquire Finnish technical consultancy Platom, expanding its Nordic footprint in highly regulated industrial and nuclear-related projects. Platom brings specialist capability in process engineering, safety analyses and licensing support for nuclear facilities and other complex plants in Finland. For civil and geotechnical engineers, the deal signals more integrated design teams on projects involving radiation shielding, containment structures and long-term asset integrity in energy and industrial infrastructure.

    Cathays station bridge installation: constructability notes for rail engineers
    Infrastructure
    2 months ago

    Cathays station bridge installation: constructability notes for rail engineers

    Major work will start on 13 June at Cathays station on the Merthyr and Rhondda line, north of Cardiff Central, to install a new bridge as part of a wider rail infrastructure upgrade. Network Rail and its contractors are expected to replace the existing structure during a blockade, using crane lifts over the operational railway and staged possessions to minimise disruption to Cardiff commuter services. For designers and contractors, key issues will include managing limited urban worksite access, maintaining track geometry tolerances, and coordinating utilities and signalling interfaces around the new bridge deck and abutments.

    HS2 uncertainty and cost escalation: delivery lessons for UK megaproject engineers
    Infrastructure
    2 months ago

    HS2 uncertainty and cost escalation: delivery lessons for UK megaproject engineers

    The government’s latest HS2 update has reopened scrutiny of the UK’s capacity to deliver megaprojects as the curtailed London–Birmingham–Manchester high-speed line faces escalating costs and phased construction stretching well beyond original 2026–2033 opening targets. Protracted uncertainty over northern legs, station scope at Euston, and interfaces with existing classic lines is driving repeated redesign, land safeguarding extensions and contractor remobilisation costs. For civil and geotechnical teams, shifting phasing and scope complicate ground investigation strategies, tunnelling logistics and long-lead materials procurement, inflating risk allowances in future bids.

    AtkinsRéalis Belfast Rapid Transit Phase 2: design and staging notes for engineers
    Infrastructure
    2 months ago

    AtkinsRéalis Belfast Rapid Transit Phase 2: design and staging notes for engineers

    AtkinsRéalis has been appointed by Northern Ireland’s Department for Infrastructure to deliver detailed design and construction supervision for Phase 2 of Belfast Rapid Transit, extending the existing Glider bus-based system. The commission will cover corridor alignment, junction remodelling, segregated bus lanes and priority signalling, plus associated structures and utilities coordination in dense urban streets. For civil and geotechnical teams, key tasks will include pavement design for high-frequency articulated buses, foundation works around buried services, and construction staging to maintain traffic and public transport operations.

    Ferrovial UK MD appointment: delivery and PPP implications for project teams
    Infrastructure
    2 months ago

    Ferrovial UK MD appointment: delivery and PPP implications for project teams

    Alastair Dick has been appointed managing director of Ferrovial Construction UK & Ireland, joining from Bechtel where he was UK head of business development for Bechtel Infrastructure. His previous roles included managing director in Bechtel’s nuclear, security and environmental business, overseeing international nuclear and security projects across the UK, Australia and the Middle East. Dick will now set strategy and performance for Ferrovial’s UK and Irish operations, leading delivery of complex rail, aviation, energy and environmental infrastructure schemes, many likely structured as PPP or privately financed programmes.

    Clarion picks Hill for Tower Hamlets homes: design and performance notes for engineers
    Infrastructure
    2 months ago

    Clarion picks Hill for Tower Hamlets homes: design and performance notes for engineers

    Clarion Housing Group has appointed The Hill Group as main contractor for the Clare House redevelopment in Tower Hamlets, delivering 145 new homes at 100% social rent with main construction scheduled from April 2027 to 2029. Demolition is already complete and associated public realm works include upgrades to the nearby Jasmine Park play space, which started in May 2026 as part of a wider regeneration programme. The redesigned Clare House is planned as a modern, energy-efficient scheme with long-term performance targets central to Clarion and Hill’s ongoing partnership.

    Amey consulting’s new directors: delivery and risk takeaways for project teams
    Infrastructure
    2 months ago

    Amey consulting’s new directors: delivery and risk takeaways for project teams

    Amey has appointed Gert Vermeiren as sector director for engineering and Stephen Knott as chief operations director in its consulting business, signalling a push to scale complex transport and infrastructure delivery. Vermeiren brings 29 years’ experience on major schemes including Stockholm Bypass, Riyadh Metro, Istanbul Airport, Paris Metro, the Moscow Ring Road and National Grid’s Great Grid Programme, plus pan-European transport portfolios. Knott, a fellow of the ICE, previously led Amey’s strategic highways business to a £200m portfolio and will now oversee consulting delivery for UK and international clients.

    Gleeds’ expanded Hinkley Point C role: cost and programme lessons for project teams
    Infrastructure
    2 months ago

    Gleeds’ expanded Hinkley Point C role: cost and programme lessons for project teams

    EDF Energy has appointed Gleeds under a new professional services framework to deliver commercial and programme management services for the Hinkley Point C nuclear power station in Somerset through to project completion. The role extends Gleeds’ existing ten‑year remit from commercial and contract management on major site civil works and marine works into wider project management, programme controls, and business support across the complex, highly regulated nuclear build. For contractors and consultants, this signals continued emphasis on rigorous cost control, contract administration and schedule integration on one of Europe’s largest nuclear construction programmes.

    Kimpton supports Cardiff high rise: MEP efficiency lessons for project teams
    Infrastructure
    2 months ago

    Kimpton supports Cardiff high rise: MEP efficiency lessons for project teams

    Kimpton has completed a £6.7m mechanical package for phase one of Watkin Jones’ Central Quay scheme in Cardiff, serving two interlinked 23-storey residential towers with 718 apartments and nearly 20,000 sq ft of leisure and retail space. The installation includes 200-litre internal heat pump cylinders in family units to reduce potable water waste while maintaining hot water capacity. A multi-extract ventilation system with heat recovery captures and recycles exhaust heat, cutting energy demand and supporting higher building services efficiency for the high-rise structure.

    Kier’s new HR head: what the leadership shift means for project teams
    Infrastructure
    2 months ago

    Kier’s new HR head: what the leadership shift means for project teams

    Kier has appointed Niki Steel as chief human resources officer and executive committee member, effective August 2026, to support performance across its roughly 10,000-strong workforce. Steel moves from FTSE 100 engineering group IMI plc, where she has been chief people officer for sector operations for the past two years. The appointment follows Kier’s decision to merge two business divisions into an “infrastructure powerhouse” under Joe Incutti, with former chief people officer Louisa Finlay now COO and James Askew in post as group commercial director since January.

    • Previous
    • 1
    • More pages31
    • 32
    • Next