Clarion picks Hill for Tower Hamlets homes: design and performance notes for engineers
Reviewed by Tom Sullivan

First reported on The Construction Index
30 Second Briefing
Clarion Housing Group has appointed The Hill Group as main contractor for the Clare House redevelopment in Tower Hamlets, delivering 145 new homes at 100% social rent with main construction scheduled from April 2027 to 2029. Demolition is already complete and associated public realm works include upgrades to the nearby Jasmine Park play space, which started in May 2026 as part of a wider regeneration programme. The redesigned Clare House is planned as a modern, energy-efficient scheme with long-term performance targets central to Clarion and Hill’s ongoing partnership.
Technical Brief
- Works interface with Jasmine Park play-space upgrades, requiring coordinated access, hoarding lines and public safety management.
- 100% social rent tenure drives strict cost control and lifecycle performance criteria in design and specification.
- Energy-efficiency and long-term performance focus suggests fabric-first envelope, low-carbon MEP and robust airtightness detailing.
Our Take
Clarion Housing Group’s repeat selection of The Hill Group at Clare House follows recent Hill-led Clarion schemes in Woolwich and Merton, signalling Clarion’s tendency to build a stable contractor panel for complex estate regeneration rather than rebidding each phase widely.
With completion at Clare House not expected until 2029, this Tower Hamlets job extends Hill’s secured London pipeline beyond the Woolwich Leisure Centre and High Path phases, which in our coverage have earlier delivery horizons, giving Hill longer-term workload visibility in the capital.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
QCDB-io
Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.


