Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Contract Award
    Projects
    Product

    Weir’s Laverton gold crushing circuit: design and upgrade notes for plant engineers

    July 10, 2026|

    Reviewed by Tom Sullivan

    Weir’s Laverton gold crushing circuit: design and upgrade notes for plant engineers

    First reported on Australian Mining

    30 Second Briefing

    Weir has secured a first-quarter 2026 contract to supply the primary crushing circuit for Brightstar Resources’ Laverton processing plant, part of the Goldfields gold project in Western Australia. The package includes Weir’s recently upgraded ENDURON ET series jaw crusher and ENDURON EC series cone crusher, covering both primary and secondary crushing duties. For plant designers and maintenance teams, the standardised OEM circuit simplifies integration with existing comminution flowsheets and future debottlenecking or throughput upgrades.

    Technical Brief

    • ENDURON ET jaw and EC cone selection standardises OEM supply across both primary and secondary stages.
    • OEM-supplied circuit reduces interface risk between crusher control, lubrication, and plant-wide SCADA systems.
    • Use of a single supplier simplifies spares inventory, wear-part forecasting, and shutdown planning for Laverton.
    • Standardised layout eases future swap-out to larger ENDURON units if Goldfields throughput is expanded.
    • Having both crushers from one OEM streamlines vibration isolation, foundation design and dynamic load assessment.
    • For similar greenfield gold plants, pre-engineered OEM circuits can shorten detailed design and commissioning schedules.

    Our Take

    Within our mining coverage, gold projects like Brightstar’s Goldfields operation are less frequently associated with large OEM contract awards than iron ore or copper, so this deal reinforces Western Australia’s goldfields as one of the few gold districts still driving sizeable greenfield and expansion spend.

    With the Laverton crushing circuit order booked for Q1 2026, in the same window as Weir’s GEHO pump order for Lloyds Metals and Energy, project teams should expect tighter lead times and stronger pricing power from Weir on major process equipment through at least the mid‑2020s.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Geopolitical risk and private capital flows: gold price signals for mine planners
    Mining
    about 7 hours ago

    Geopolitical risk and private capital flows: gold price signals for mine planners

    Growing geopolitical tensions are pushing capital out of sovereign bonds and into private assets, a rotation market-cycle analyst Martin Armstrong links to a potential renewed gold rally from Q1 next year. Armstrong sees Europe as particularly exposed, arguing EU states face rising war-related borrowing costs and inflation as “war drums” lift long-term rates, while bond markets “give us the real story”. He warns that if gold closes below $4,000/oz weekly it could test $3,500–$3,700, but expects elections in the US, Israel and Ukraine to keep geopolitical risk elevated and ultimately drive prices higher.

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    2 days ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    2 days ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental