Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    October 10, 2026|

    Reviewed by Joe Ashwell

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Technical Brief

    • Transaction structure combines cash and Discovery Mining stock, affecting McEwen’s near-term liquidity and equity exposure.
    • Sale package includes Lexam VG Gold’s 100% Fuller interest plus VG Holdings’ associated surface rights.
    • Paymaster divestment transfers McEwen’s 60% JV stake to Discovery’s Dome Mine, consolidating 100% ownership.
    • Combined footprint sold totals 389 hectares within the Fox Complex land position in Timmins.
    • Ontario portfolio post-sale remains centred on Froome, Stock and Grey Fox as core producing/development assets.
    • Stock Mine ramp-up is sequenced: first ore Q4 2026, commercial production targeted for Q1 2027.
    • Grey Fox, Tartan and Nevada’s Gold Bar Complex are budgeted for near-term surface works and equipment procurement.
    • El Gallo construction in Mexico commenced September 2026, with first production targeted in H2 2027.

    Our Take

    In our database, this Ontario gold portfolio reshaping by McEwen sits alongside its push to advance the Los Azules copper project in Argentina, suggesting the company is recycling Canadian gold proceeds into de‑risking a large copper growth option rather than expanding Fox Complex land holdings further.

    The Grey Fox pre‑feasibility work near Timmins already extends Fox Complex life into the 2030s, so divesting smaller Timmins‑area properties like Fuller and Paymaster likely reflects a decision to focus capital on underground development and mill debottlenecking around Froome, Stock and Grey Fox rather than on additional satellite feed.

    With copper stocks on the LME recently at a six‑week low and multiple copper‑themed items in our coverage flagging looming supply gaps, McEwen’s mix of gold cash flow from Canada, Nevada and Mexico with exposure to Los Azules positions it as a hybrid gold–copper play rather than a pure Ontario gold producer.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Austral–Hammer Metals takeover: copper pit options and risks for mine planners
    Mining
    about 10 hours ago

    Austral–Hammer Metals takeover: copper pit options and risks for mine planners

    Austral Resources has secured Federal Court approval for its scheme of arrangement to acquire Hammer Metals, with the deal becoming legally effective on 16 November and aimed at expanding copper operations in north-west Queensland. The transaction consolidates Austral’s existing Lady Annie–type heap leach and SX–EW copper production footprint with Hammer’s Mount Isa–region exploration ground, including several IOCG and copper–gold targets. For geotechnical and mine planners, the combined tenure increases optionality for open-pit and potential underground copper development in a tightly contested Queensland copper belt.

    Tungsten Mining’s Watershed project: DFS economics and design notes for engineers
    Mining
    about 10 hours ago

    Tungsten Mining’s Watershed project: DFS economics and design notes for engineers

    Tungsten Mining’s definitive feasibility study for the Watershed tungsten project in Far North Queensland reports a pre-tax net present value of $1.57 billion and internal rate of return of 70 per cent, with post-tax figures of $1.11 billion NPV and 57 per cent IRR. The project centres on open-pit extraction of scheelite and wolframite ores, with processing via conventional crush–grind–flotation to produce tungsten concentrate. These economics signal a potentially high-margin Australian tungsten supply source, relevant for long-term offtake and project finance decisions.

    Mount Isa critical minerals hub: feasibility insights for process engineers
    Mining
    about 10 hours ago

    Mount Isa critical minerals hub: feasibility insights for process engineers

    A proposed critical minerals and rare earths research centre in Mount Isa has secured a $965,000 commitment from the Australian and Queensland governments and Mount Isa City Council to fund a feasibility study. The concept focuses on metallurgical testing, piloting and treatment of critical minerals and rare earths, potentially giving North West Queensland miners local access to bench‑scale and pilot‑scale process development instead of sending samples interstate. For geometallurgy and flowsheet design teams, a local hub could shorten testwork lead times and de‑risk new processing routes for complex orebodies.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental