Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Uranium’s multi-year structural bull market: supply–demand lens for mine planners

    January 30, 2026|

    Reviewed by Tom Sullivan

    Uranium’s multi-year structural bull market: supply–demand lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Uranium prices are forecast by Abu Dhabi-based Teniz Capital to enter a “long-duration structural bull market”, with a 3–4x price increase possible as primary mine output covers only 74–90% of current reactor demand and secondary inventories are largely exhausted. The bank projects uranium demand to rise 28% by 2030 and double by 2040, with new mines needing 10–15 years to come online, making the 2030s supply deficit effectively “programmed”. Kazatomprom, supplying about 39–43% of global production and controlling most ISR-suitable reserves, is identified as a systemically critical, low-cost producer with no comparable alternative this side of 2045.

    Technical Brief

    • Spot uranium rebounded from a 2016–2017 low of ~$18/lb to $106/lb in early 2024.
    • Prices then consolidated in a $73–80/lb band by end‑2024, indicating a new, higher cost base.
    • Teniz Capital characterises current supply as “structurally short”, driven by years of underinvestment in new mines.
    • Secondary supplies (commercial inventories and reprocessed material) are described as “largely depleted”, removing a historic balancing mechanism.
    • Development lead times of 10–15 years mean today’s project pipeline cannot materially affect 2030s supply.

    Our Take

    With uranium and uranium concentrate flagged in only 18 keyword-matched pieces across 798 Mining stories, this projected 3–4x price uplift suggests uranium is still under-represented in deal and project coverage relative to other critical minerals like copper and niobium in our database.

    The dominance of Kazatomprom in Russia and Central Asia, combined with US and French nuclear demand, implies utilities in the United States and France may face similar supply-security questions now being debated for other critical minerals under recent US Section 232 decisions referenced in our copper and critical minerals coverage.

    Cyclic Materials’ $82M rare earth recycling plant in South Carolina, alongside other rare earth project updates such as Victory Metals’ North Stanmore work, signals that midstream and recycling capacity for rare earths is scaling faster than primary uranium mine development, potentially tightening the relative bottleneck on nuclear fuel rather than on associated magnet materials.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Epiroc order at MMG’s Khoemacau Copper Mine: fleet and automation notes for engineers

    Epiroc has secured a large underground mining equipment order from MMG Limited for the Khoemacau copper mine in Botswana, where MMG is working with Chinese contractors China Huaye and 23MCC under the ownership of China Minmetals Corp. The package is expected to include core underground production fleets such as face drilling rigs, loaders and mine trucks suited to deep, high-tonnage copper operations. For engineers, the deal signals long-term mechanised development at Khoemacau and likely standardisation around Epiroc’s automation-ready platforms and digital support tools.

    Mining
    about 17 hours ago

    Cosmic Boy Concentrator conversion: design and tie-in notes for project engineers

    GR Engineering Services has signed an EPC contract with Myamba Minerals, a Medallion Metals subsidiary, to redesign, procure, construct and commission the conversion of the existing Cosmic Boy Concentrator in Western Australia. The brownfield plant, originally built for nickel, will be reconfigured for Myamba’s processing requirements, allowing reuse of major infrastructure rather than building a new concentrator. For project engineers, the deal signals upcoming detailed process design, tie-ins to existing utilities and structural upgrades around the grinding, flotation and tailings handling circuits.

    Mining
    about 17 hours ago

    NRW’s Karara mine extension to 2032: planning and fleet notes for engineers

    NRW Holdings’ Mining division has secured a Letter of Award extending its mining services contract at the Karara magnetite iron ore mine in Western Australia by five years, pushing the term from March 2027 to February 2032. The extension covers continued load-and-haul, drill-and-blast and ancillary mining services for Karara Mining Ltd’s large-scale, 8+ Mt/y magnetite operation, which uses high-pressure grinding rolls and magnetic separation. The longer tenure gives NRW greater certainty for fleet deployment, labour planning and maintenance scheduling across the Mid West project.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental