Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Uranium’s multi-year structural bull market: supply–demand lens for mine planners

    January 30, 2026|

    Reviewed by Tom Sullivan

    Uranium’s multi-year structural bull market: supply–demand lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Uranium prices are forecast by Abu Dhabi-based Teniz Capital to enter a “long-duration structural bull market”, with a 3–4x price increase possible as primary mine output covers only 74–90% of current reactor demand and secondary inventories are largely exhausted. The bank projects uranium demand to rise 28% by 2030 and double by 2040, with new mines needing 10–15 years to come online, making the 2030s supply deficit effectively “programmed”. Kazatomprom, supplying about 39–43% of global production and controlling most ISR-suitable reserves, is identified as a systemically critical, low-cost producer with no comparable alternative this side of 2045.

    Technical Brief

    • Spot uranium rebounded from a 2016–2017 low of ~$18/lb to $106/lb in early 2024.
    • Prices then consolidated in a $73–80/lb band by end‑2024, indicating a new, higher cost base.
    • Teniz Capital characterises current supply as “structurally short”, driven by years of underinvestment in new mines.
    • Secondary supplies (commercial inventories and reprocessed material) are described as “largely depleted”, removing a historic balancing mechanism.
    • Development lead times of 10–15 years mean today’s project pipeline cannot materially affect 2030s supply.

    Our Take

    With uranium and uranium concentrate flagged in only 18 keyword-matched pieces across 798 Mining stories, this projected 3–4x price uplift suggests uranium is still under-represented in deal and project coverage relative to other critical minerals like copper and niobium in our database.

    The dominance of Kazatomprom in Russia and Central Asia, combined with US and French nuclear demand, implies utilities in the United States and France may face similar supply-security questions now being debated for other critical minerals under recent US Section 232 decisions referenced in our copper and critical minerals coverage.

    Cyclic Materials’ $82M rare earth recycling plant in South Carolina, alongside other rare earth project updates such as Victory Metals’ North Stanmore work, signals that midstream and recycling capacity for rare earths is scaling faster than primary uranium mine development, potentially tightening the relative bottleneck on nuclear fuel rather than on associated magnet materials.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Kazakhstan in focus: mining strategy and risk takeaways for project teams
    Mining
    about 2 hours ago

    Kazakhstan in focus: mining strategy and risk takeaways for project teams

    Kazakhstan is positioning itself as an active broker between Russia, China and the West, leveraging assets such as the reopened Soviet-era National Geological Survey archive and state uranium producer Kazatomprom while reclaiming major industrial sites like the Qarmet steelworks and the Kostenko coal mine, where 46 miners died in a 2023 explosion. Western oil majors Chevron and ExxonMobil have operated the Tengiz field since 1993, but that mega-project model does not translate directly to fragmented critical minerals supply chains dominated midstream by Chinese processing. For miners, the opportunity hinges on building non-Russian, non-Chinese export routes and in-country processing capacity in a state that now negotiates from far greater economic and political strength than in its early production-sharing era.

    South32–Alcoa $5.6B aluminium deal: portfolio and asset impacts for mine planners
    Mining
    about 2 hours ago

    South32–Alcoa $5.6B aluminium deal: portfolio and asset impacts for mine planners

    South32 is divesting nearly its entire aluminium portfolio to Alcoa in a deal valued at up to $5.6 billion, covering its 86% stake in Worsley Alumina, 100% of Hillside Aluminium in South Africa, and minority interests in Brazil’s MRN bauxite mine, alumina refinery and smelter, while excluding Mozal Aluminium in Mozambique. Alcoa will pay $3.1 billion in cash, $1 billion in shares (about 6% of its equity), assume roughly $750 million in liabilities and may add up to $750 million linked to aluminium prices to 2030. The transaction shifts South32’s portfolio to base and precious metals with an expected 85% of pro-forma EBITDA from these commodities and a targeted A$125 million per year overhead reduction, while Alcoa projects about $900 million NPV in synergies from the integrated mine–refinery–smelter chain.

    Guardian’s $660M Nevada tungsten mine: PFS economics and risk lens for engineers
    Mining
    about 2 hours ago

    Guardian’s $660M Nevada tungsten mine: PFS economics and risk lens for engineers

    Guardian Metal Resources may move directly from prefeasibility to construction at its Pilot Mountain tungsten project in western Nevada, after a new PFS returned a post-tax NPV8 of $660.3 million, 59.6% IRR and a one-year payback on $288.7 million in capex. The plan envisages an eight-year open-pit operation mining 11.8 million tonnes of probable reserves at 0.171% WO3, feeding a 4,000 t/d mill to produce 15,916 tonnes of 60% WO3 concentrate plus 2.1 million oz silver. Guardian targets adjusted operating costs of $54,622 per tonne WO3 (net of by-products), is filing its mine plan with the BLM next month and aims for all concentrate to be processed in the US.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy