    Seabridge Courageous Lake spin-out: project economics and mine design notes

    December 16, 2025|

    Reviewed by Joe Ashwell

    Seabridge Courageous Lake spin-out: project economics and mine design notes

    First reported on MINING.com

    30 Second Briefing

    Seabridge Gold will spin out its 100%-owned Courageous Lake project in Canada’s Northwest Territories into a new listed vehicle, Valor Gold, distributing shares to existing Seabridge investors. Courageous Lake hosts 11 million oz measured and indicated (145.2 Mt at 2.36 g/t) plus 3.3 million oz inferred (40.6 Mt at 2.52 g/t), including 2.8 million oz of open-pittable proven and probable reserves at 2.6 g/t, with a February 2024 PFS outlining 201,000 oz/year over 12.6 years. At US$1,850/oz gold the PFS gives an after-tax NPV5 of US$523 million and 20.6% IRR, with further upside from a PEA-stage pit expansion and the high-grade Walsh Lake satellite (4.13 Mt at 4.18 g/t) on a largely unexplored ~500 km² land package.

    Technical Brief

    • PFS sensitivity shows NPV5 rising from US$523m at US$1,850/oz to US$1.1bn at US$2,500/oz.
    • IRR improves from 20.6% to 38.2% across the same gold price range, with payback shortening from 2.8 to 1.6 years.
    • PFS mine plan exploits less than 30% of the measured and indicated resource, leaving substantial in-situ inventory unmined.
    • Conceptual PEA pit expansion incorporates inferred resources that require additional drilling and engineering to reach PFS confidence.
    • Walsh Lake satellite deposit adds 4.13 Mt at 4.18 g/t inferred (c.555,000 oz), potentially supporting satellite pit scheduling.
    • District-scale land package covers ~500 km², of which under 15% has been systematically explored to date.
    • Valor Gold listing is planned on at least one major stock exchange, with shares distributed directly to existing Seabridge holders.

    Our Take

    With only about 30% of the 11 Moz measured and indicated resource at Courageous Lake feeding into the current PFS mine plan, the spin-out to Valor Gold effectively packages a large pipeline of optionality ounces that can be phased in or re-scoped as logistics and NWT cost assumptions evolve.

    The relatively strong base-case economics (20.6% IRR, 2.8-year payback) in a remote Northwest Territories setting suggest that any future improvements in access, power, or camp-sharing with other NWT projects could materially lift the Courageous Lake NPV beyond the current C$523 million benchmark.

    In our database of 331 Mining stories, most Canada gold project items are in more established provinces than the Northwest Territories, so Seabridge’s decision to separate Courageous Lake from its British Columbia KSM asset likely reflects the distinct permitting, infrastructure, and investor risk profiles between the two regions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Vale–Caterpillar autonomous truck expansion in Pará: productivity and safety notes for ...
    Mining
    about 8 hours ago

    Vale–Caterpillar autonomous truck expansion in Pará: productivity and safety notes for ...

    Vale, Caterpillar and dealer Sotreq have agreed to expand Vale’s autonomous haulage fleet in the Northern System in Pará from 14 Cat MineStar Command trucks today to about 90 units by 2028, including models rated up to 400 tonnes. Deployment will roll out across the Serra Norte and Serra Sul iron ore units over five years, building on autonomous operations that started in 2019. Vale reports up to 15% gains in operational performance, up to 7.5% fuel savings and more than 260 staff already retrained for digital and supervisory roles.

    McEwen’s El Gallo mine EIA extension: capex, schedule and throughput notes for engineers
    Mining
    about 11 hours ago

    McEwen’s El Gallo mine EIA extension: capex, schedule and throughput notes for engineers

    McEwen Mining has secured Mexican federal approval to extend the environmental impact assessment for its El Gallo project in Sinaloa, clearing the way for Phase 1 mill construction targeted to start mid-2026 and first gold pour in 2027. Phase 1 of the Fenix redevelopment will reprocess material from the existing historical leach pad via a new mill and leach circuit, aiming for about 20,000 oz gold-equivalent per year over 10 years, with initial capex estimated at US$42 million. A contemplated Phase 2 would add in-situ silver deposits for an extra US$24 million, potentially extending mine life beyond the current plan.

    Sunrise scandium project financing: key mine development notes for engineers
    Mining
    about 12 hours ago

    Sunrise scandium project financing: key mine development notes for engineers

    Sunrise Energy Metals has raised a further A$32.5 million via a 5 million-share placement at A$6.50 to fund pre-construction at its Syerston scandium project in New South Wales, taking total recent equity financing to about A$105 million, with A$59 million still subject to shareholder approval and a potential US EXIM loan of $67 million pending. The Syerston deposit hosts nearly 46 million measured and indicated tonnes grading 414 ppm scandium and is designed to produce about 60 tonnes of scandium per year over a 32-year mine life. Lockheed Martin has already signalled offtake interest for roughly 25% of annual output under the Australia–US critical minerals pact, providing early demand visibility for project development decisions.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.