Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award
    Product

    Sandvik fleet and service at Viscaria copper restart: planning notes for mine teams

    August 5, 2026|

    Reviewed by Tom Sullivan

    Sandvik fleet and service at Viscaria copper restart: planning notes for mine teams

    First reported on International Mining – News

    30 Second Briefing

    Sandvik has been selected by Gruvaktiebolaget Viscaria to supply the underground production fleet, rock tools and a lifecycle service contract for the restart of the Viscaria copper mine in Kiruna, northern Sweden. The package will include production drills and loaders tailored for underground copper operations, with Sandvik responsible for both equipment delivery and ongoing maintenance support. For mine planners and maintenance teams, the integrated fleet-and-service model signals a long-term OEM presence on site and a shift towards standardised Sandvik systems across drilling, loading and ground support.

    Technical Brief

    • Contract bundles underground production fleet, rock tools and service into a single integrated supply agreement.
    • Viscaria is described as one of northern Europe’s most significant copper development projects, indicating multi-year production planning.
    • Reopening an existing mine rather than greenfield development points to brownfield shaft, ramp and level rehabilitation demands.
    • Long-term OEM presence on site typically enables tighter parts inventory control and reduced unplanned equipment downtime.

    Our Take

    Gruvaktiebolaget Viscaria has already locked in Nordec for the processing plant structures and Metso for the grinding circuit at Viscaria, so the Sandvik mobile fleet and tools award effectively rounds out the core mining-and-processing equipment package for the restart.

    Within our copper-tagged mining coverage, Viscaria in Sweden stands out as one of the few European restart projects where a single operator (Gruvaktiebolaget Viscaria) has moved rapidly to secure multiple tier-one OEMs, signalling a push to de-risk execution and uptime ahead of commissioning.

    Sandvik’s separate move to outsource warehousing to DHL Supply Chain in Eindhoven suggests that parts and rock tools support for the Viscaria copper mine will increasingly rely on a streamlined European logistics hub, which should help reduce lead times for critical spares once production ramps up.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental