Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Omai Gold’s Wenot drilling: new high‑grade zone and PEA pit implications for engineers

    December 9, 2025|

    Reviewed by Joe Ashwell

    Omai Gold’s Wenot drilling: new high‑grade zone and PEA pit implications for engineers

    First reported on MINING.com

    30 Second Briefing

    Drilling at Omai Gold Mines’ Wenot deposit in Guyana has defined a new high‑grade zone east of the historical pit, with hole 25ODD‑142 cutting 14.7 metres at 11.07 g/t gold from 304 metres, including 4.3 metres at 34.31 g/t, and 25ODD‑145W in Central Wenot returning 13.3 metres at 13.54 g/t from 398 metres. The 35,300 metres of 2025 diamond drilling across 79 holes suggest the central contact and quartz feldspar porphyry may dip south in the east, with implications for pit geometry and strip ratio in the upcoming PEA. Omai, already hosting 2.12 million oz indicated at 2.07 g/t and 4.38 million oz inferred at 1.95 g/t, is targeting resource growth and conversion that could support a “very robust” open pit mine plan.

    Technical Brief

    • Central Wenot hole 25ODD-145W includes 6.2 metres grading 27.82 g/t within the high-grade interval.
    • East Wenot hole 25ODD-144 intersected 31.6 metres at 1.11 g/t from 526 metres downhole.
    • Within 25ODD-144, sub-intervals comprise 12 metres at 0.98 g/t and 13 metres at 0.99 g/t.
    • East Wenot hole 25ODD-146 returned 16 metres at 1.02 g/t from 304 metres depth.
    • Structural interpretation suggests the central contact and quartz feldspar porphyry dip southwards in the eastern sector.
    • Current indicated resources are 2.12 Moz at 2.07 g/t within 31.9 million tonnes.
    • Inferred resources stand at 4.38 Moz at 1.95 g/t contained in 69.6 million tonnes.
    • The brownfield project overlies the former Omai mine, which produced over 3.7 Moz between 1993–2005.

    Our Take

    With 2.12 Moz indicated and 4.38 Moz inferred at the Omai gold project, the current resource already places Omai Gold Mines toward the upper end of single-asset gold stories in our Mining database, which may explain why a 3% share move followed what is essentially incremental drilling news.

    Historic production of 3.7 Moz at the former Omai gold mine, combined with current grades around 2 g/t, suggests that any future restart could leverage existing geological understanding and potentially lower discovery risk compared with greenfield Guyanese gold projects also covered in our Latin America set.

    The depth of the highlighted Wenot and Central Wenot intercepts (around 300–500 m) implies an emerging focus on underground or deeper open-pit potential, which in Guyana typically brings more complex geotechnical and dewatering requirements than the shallow saprolite-dominated deposits seen in some other regional gold items in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    CITIC HIC semi-mobile crusher at Duobaoshan: design and throughput notes for mine planners

    A PSZ3000-B semi-mobile gyratory crushing station, independently designed and built by CITIC Heavy Industries in Luoyang, has completed no-load and load commissioning at Zijin Mining’s Phase II expansion of the Duobaoshan copper-molybdenum mine in Heilongjiang, with all performance indicators meeting design standards. The semi-mobile unit is configured as a primary crusher station for the expanded open pit, allowing truck-fed in-pit crushing with conveyor transfer to downstream processing. For mine planners and plant engineers, the successful commissioning confirms Chinese-built large semi-mobile gyratory technology as a viable option for high-throughput greenfield and brownfield expansions.

    Mining
    about 5 hours ago

    LEEA GLAD procurement survey: compliance and lifecycle insights for mine teams

    LEEA has launched a procurement-focused survey to feed into a new white paper scheduled for release on Global Lifting Awareness Day (GLAD) on 2 July 2026, with details hosted on the updated campaign site globalliftingawarenessday.com. Targeted at stakeholders who specify or purchase cranes, hoists, slings and other lifting accessories, the initiative centres on the theme “Not all lifting equipment is…”, aiming to capture how compliance, whole‑life cost and inspection regimes are currently weighted in buying decisions. Mining owners, EPCMs and contractors can use the findings to benchmark procurement practices against industry expectations and tightening safety standards.

    Mining
    about 5 hours ago

    Hitachi EH5000 100,000‑hour milestone at Lumwana: capex and fleet life notes for planners

    Three 296 t class Hitachi EH5000 rigid dump trucks at Barrick’s Lumwana copper mine in Zambia have each passed 100,000 operating hours, an unusually high lifecycle for ultra-class haulage equipment in hard-rock copper operations. The milestone, marked at a joint Barrick–Hitachi recognition ceremony, points to effective component rebuild strategies, condition-based maintenance and strong dealer support for the EH5000 fleet. For mine planners and maintenance teams, it signals potential to extend truck life beyond typical replacement cycles, with implications for capex timing and fleet renewal strategies.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy