Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Product

    LiuGong battery electric fleet at Conch Cement: haulage design notes for mine planners

    July 15, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    A fleet of LiuGong DW105AE battery electric wide-body trucks has been deployed at a Conch Cement mine in south China as the company pushes towards zero‑carbon mine operations. The DW105AE trucks replace conventional diesel haul units previously supplied by LiuGong, using high‑capacity lithium battery packs and electric drivetrains to cut on-site diesel combustion and associated CO₂ emissions. For mine planners and maintenance teams, the shift implies new charging infrastructure design, revised haul‑cycle calculations around battery range, and different service regimes for electric powertrains.

    Technical Brief

    • For similar mining operations, cement-style short, repetitive hauls are technically favourable for early battery truck adoption.

    Our Take

    LiuGong’s work with Conch Cement in south China follows its large quarry and cement-sector deployments with Holcim UK, suggesting the OEM is targeting high-throughput, fixed-plant materials producers as early adopters of battery-electric fleets.

    Across our Mining coverage, LiuGong increasingly appears in stories tagged ‘Sustainability’ and ‘Product’, from the DR50CE battery-electric rigid truck in the UK to ultra-large excavators in China, signalling a push to cover the full load–haul–excavate chain with low- or zero-emission options.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Vitreo’s $300M Angus silica sand mine: EAO approval and design notes for engineers
    Mining
    about 3 hours ago

    Vitreo’s $300M Angus silica sand mine: EAO approval and design notes for engineers

    British Columbia has issued an environmental assessment certificate for Vitreo Minerals’ $300 million Angus silica sand mine north of Prince George, clearing the way for a 20‑year operation producing up to 2 million tonnes of proppant annually. The Environmental Assessment Office found no significant adverse effects with mitigation, and requires the project to be substantially started by 2036. Construction is expected to create about 150 jobs and operations nearly 140, with formal participation from Lheidli T’enneh, McLeod Lake, Tsay Keh Dene and West Moberly First Nations in the assessment process.

    Mining
    about 3 hours ago

    Macmahon at Mt Marion: underground shift and design notes for lithium mine teams

    Macmahon Underground Pty Ltd has secured an underground mining services contract at the Mt Marion lithium operation, 70 km south of Kalgoorlie, jointly owned by Mineral Resources and Jiangxi Ganfeng Lithium on a 50:50 basis. The scope covers underground development and production work, signalling a shift from Mt Marion’s historically open-pit focus towards a deeper, longer-life operation. Geotechnical and mine planning teams should expect new requirements around underground ground control, ventilation, and ore handling design for hard-rock lithium orebodies in the Eastern Goldfields setting.

    Almonty–Global Tungsten offtake extension: supply and pricing lens for mine planners
    Mining
    about 3 hours ago

    Almonty–Global Tungsten offtake extension: supply and pricing lens for mine planners

    Almonty Industries has extended its offtake agreement with Global Tungsten & Powders for concentrate from the Sangdong mine in South Korea from 15 to 21 years, lifting total contracted volume by 40% from 3,150,000 to 4,410,000 metric tonne units and locking in a 6.3% price uplift per MTU. The deal secures minimum deliveries of 210,000 MTU per year after ramp-up, covering about 90% of Phase I mine output and supplying GTP’s US facilities. With Chinese export curbs driving record tungsten prices, the contract provides long-duration, conflict-free feedstock into Western defence and industrial powder supply chains.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy