Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    JordProxa at Lilac’s Great Salt Lake DLE plant: process design notes for engineers

    July 20, 2026|

    Reviewed by Tom Sullivan

    JordProxa at Lilac’s Great Salt Lake DLE plant: process design notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    JordProxa has been selected as technology and equipment partner for Lilac Solutions’ Phase 1 commercial lithium carbonate plant on Utah’s Great Salt Lake, which targets 5,000 t/y of battery-grade lithium carbonate using direct lithium extraction. The partnership covers the downstream conversion process, integrating JordProxa’s thermal and process equipment with Lilac’s ion-exchange DLE system. First lithium production is planned for 2028, signalling a move from pilot-scale brine processing to a full commercial facility in a chemically complex salt-lake environment.

    Technical Brief

    • JordProxa’s scope covers thermal and process equipment for the downstream lithium conversion circuit.
    • Integration work must accommodate Lilac’s ion-exchange DLE output chemistry from Great Salt Lake brines.
    • Equipment selection will need to manage scaling, fouling and corrosion risks typical of complex salt-lake brines.
    • Process control integration between JordProxa’s equipment and Lilac’s DLE plant will be central to product quality stability.
    • For other DLE projects, the partnership signals growing specialisation in third-party downstream conversion packages.

    Our Take

    For process vendors such as JordProxa, securing a downstream conversion role on a US DLE project at this stage positions them early in what our coverage shows is still a relatively small but growing subset of lithium stories focused on commercial-scale DLE rather than conventional evaporation or hard-rock processing.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Astec–TerraSource one year on: crushing circuit implications for mine planners
    Mining
    about 7 hours ago

    Astec–TerraSource one year on: crushing circuit implications for mine planners

    Astec Industries’ US$245 million acquisition of TerraSource Global, completed on 1 July 2025, is now feeding integrated crushing and sizing solutions into both hard rock and coal operations, combining Astec’s track-mounted jaw and cone plants with TerraSource’s Gundlach roll crushers and Jeffrey Rader feeders. Management is pushing common controls and telematics across this combined fleet to standardise spares, condition monitoring and wear-part planning. For mine operators, the tie-up mainly affects front-end flowsheet choices, OEM support models and lifecycle cost assumptions for primary and secondary crushing circuits.

    Mining
    about 7 hours ago

    EACON Mining–XCMG autonomy deal: deployment takeaways for haulage engineers

    EACON Mining Technology has signed an MOU with mining equipment major XCMG in Perth to deepen cooperation on autonomous haulage solutions in overseas markets, with a particular focus on Australia. The agreement links EACON’s autonomous haulage system technology with XCMG’s large mining truck fleet, positioning the pair to offer integrated OEM-agnostic autonomy packages for Australian iron ore and coal operations. For mine operators, the tie-up could simplify deployment of autonomous truck fleets by combining control software, drive-by-wire kits and truck hardware under a coordinated delivery model.

    Mining
    about 7 hours ago

    Yitirrti 1.5 Mt/y plant EPC: design and wear risks for processing engineers

    GR Engineering Services has secured an EPC contract from Venturex Sulphur Springs Pty Ltd, a Develop Global subsidiary, to design and construct a 1.5 Mt/y copper-silver-zinc processing plant for the Yitirrti (formerly Sulphur Springs) project in Western Australia. The scope covers full engineering, procurement and construction of the concentrator and associated infrastructure, positioning the project for medium-scale sulphide ore throughput. Plant design choices and materials handling layouts will be critical for managing polymetallic recovery and abrasive sulphide ore wear in a remote Pilbara-style environment.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental