Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    International No-Dig Auckland 2026: trenchless insights for civil and geotechnical engineers

    December 17, 2025|

    Reviewed by Joe Ashwell

    International No-Dig Auckland 2026: trenchless insights for civil and geotechnical engineers

    First reported on Roads & Infrastructure (AU)

    30 Second Briefing

    International No-Dig Auckland will bring the global trenchless technology sector to New Zealand on 28–29 October 2026, positioning Auckland as a regional hub for no-dig pipeline and utility installation. The event will gather major equipment suppliers, contractors and asset owners under one roof, with a focus on HDD rigs, microtunnelling systems and cured-in-place pipe (CIPP) rehabilitation. For Australasian civil and geotechnical engineers, it offers direct access to international case studies on minimising surface disruption, managing difficult ground conditions and upgrading ageing buried infrastructure.

    Technical Brief

    • Concentration of global suppliers in one venue supports side-by-side assessment of HDD rig capabilities and footprints.
    • Contractors gain access to live discussions on ground investigation requirements specific to trenchless design.
    • Asset owners can interrogate lifecycle cost data for CIPP versus conventional pipe replacement in urban corridors.
    • Sessions are expected to cover risk allocation for trenchless works within standard design-and-construct contracts.
    • Knowledge transfer from European and North American no-dig case studies can refine local trenchless specification clauses.

    Our Take

    Among the 286 Infrastructure stories in our database, very few are tied to New Zealand, so International No-Dig Auckland stands out as a rare regional focal point for trenchless know‑how that Australasian councils and utilities can tap into.

    With the event framed under the Projects tag, this Auckland gathering is likely to be used by Australian and New Zealand asset owners to de‑risk upcoming pipeline and road corridor works where open‑cut is constrained by dense urban fabric or environmental sensitivities.

    Prime Creative Media’s involvement signals that coverage and case studies from International No-Dig Auckland are likely to feed back into Australian practice, accelerating the transfer of trenchless methods from early adopters in Auckland to road and water projects across Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Kier, Costain and Sizewell C appointments: delivery implications for UK project teams
    Infrastructure
    1 day ago

    Kier, Costain and Sizewell C appointments: delivery implications for UK project teams

    Senior leadership changes in UK infrastructure this month include new appointments at Kier, Costain and the Sizewell C nuclear project, signalling continued boardroom churn despite a seasonal slowdown. Moves at Kier and Costain affect major highways and rail frameworks, where both contractors hold multi‑year NEC contracts with National Highways and Network Rail worth hundreds of millions of pounds. Governance and delivery capability at Sizewell C are also in focus as the project advances enabling works for the twin EPR units and associated marine and civils packages.

    HS2 2025 build progress: continuity and risk notes for project engineers
    Infrastructure
    4 days ago

    HS2 2025 build progress: continuity and risk notes for project engineers

    HS2 Ltd reports steady 2025 build progress, with major earthworks, tunnelling and viaduct construction advancing on Britain’s largest live infrastructure scheme despite a leadership-led operational reset of the programme. Updated delivery plans are being phased in while maintaining work on key civil assets such as long-section bored tunnels and multi-span high-speed rail viaducts, rather than pausing site activity. For contractors and designers, the message is continuity of core geotechnical and structural work under revised governance and sequencing, not a wholesale slowdown.

    Network Rail £160M Christmas works: delivery and risk notes for project teams
    Infrastructure
    10 days ago

    Network Rail £160M Christmas works: delivery and risk notes for project teams

    Network Rail is delivering £160M of works over Christmas and New Year across England, Wales and Scotland, combining large-scale renewals of ageing track, structures and overhead line equipment with installation of modern digital signalling. Possessions will concentrate on key main line bottlenecks and junctions, with multi-day blockades used to replace life-expired assets and reconfigure layouts for higher line speeds and more reliable timetabling. Contractors will need to manage intensive access windows, complex isolations and winter working risks while handing back routes for the post-holiday peak.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.