Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Standard/Guideline
    Projects

    ICE Council 2026: strategic influence on standards and resilience for engineers

    January 19, 2026|

    Reviewed by Joe Ashwell

    ICE Council 2026: strategic influence on standards and resilience for engineers

    First reported on New Civil Engineer

    30 Second Briefing

    New members are being sought for the Institution of Civil Engineers (ICE) Council for the session starting in November 2026, with elected members helping to set policy on infrastructure, professional standards and climate resilience. Council members typically influence guidance on areas such as geotechnical risk management, asset resilience for bridges and tunnels, and the adoption of digital design and construction methods. Chartered and incorporated engineers considering standing should assess the time commitment for attending Council meetings in London and contributing to technical and regional committees.

    Technical Brief

    • Council session explicitly scheduled to commence in November 2026, fixing the policy cycle timeframe.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    ICE critique of UK transport strategy: delivery risks for project teams
    Policy
    3 days ago

    ICE critique of UK transport strategy: delivery risks for project teams

    The Institution of Civil Engineers has warned that the UK government’s new Better Connected integrated transport strategy lacks the clear, long-term objectives and investment pathways needed to steer major rail, road and mass transit schemes. ICE argues the document omits essential components such as defined modal priorities, a sequenced project pipeline and stable funding signals that asset owners and contractors require for planning multi‑decade programmes. The critique signals continued uncertainty for large schemes needing early geotechnical investigation, corridor safeguarding and staged capacity upgrades.

    US rare earth strategy shift: processing, price floors and risk for project teams
    Policy
    3 days ago

    US rare earth strategy shift: processing, price floors and risk for project teams

    US rare earth strategy is shifting from securing ore to controlling processing, with Aclara Resources’ Virginia Tech pilot and planned Louisiana separation plant illustrating a policy pivot towards domestic heavy rare earth separation for dysprosium and terbium used in EVs, wind and defence. Patricio Faúndez, economics leader at GEM Mining Consulting, notes Washington is now deploying price floors, equity stakes and long-term offtakes—tools long associated with China—to de-risk capital-intensive plants. The emerging model favours allied feedstock plus US-based processing, redistributing supply risk across jurisdictions rather than eliminating it.

    HBF calls for BNG reforms: planning and viability impacts for project teams
    Policy
    3 days ago

    HBF calls for BNG reforms: planning and viability impacts for project teams

    Difficulties implementing mandatory Biodiversity Net Gain (BNG) are slowing housing projects, with a Home Builders Federation survey of 80 firms finding 84% still struggle with BNG and 80% reporting planning delays while local authorities review biodiversity assessments. Sixty per cent said BNG has deterred them from pursuing sites that would previously have been viable, citing policy uncertainty, inconsistent application of requirements and cumulative regulatory cost. Some capacity issues are easing, with reported shortages of in-house expertise down from 79% to 66% and adequate off-site biodiversity unit supply up from 31% to 47%.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.