Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Product

    H-Power phase two Komatsu ammonia engine: implications for mine haulage design

    August 10, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    H-Power plc has completed phase one of its Joint Development Agreement with Komatsu to assess an ammonia-fuelled engine platform and is moving into phase two to design and integrate its proprietary ammonia cracking technology into Komatsu machinery. The programme focuses on on-board conversion of ammonia to hydrogen-rich fuel gas, aiming to cut diesel use and CO₂ emissions in large mining equipment without major changes to existing engine architecture. For mine operators, this signals potential future options for low-carbon haul trucks and excavators where grid power or full battery electrification is impractical.

    Technical Brief

    • JDA between H-Power plc and Komatsu was formally initiated on 10 February 2026.
    • Phase one focused on feasibility assessment of an ammonia-fuelled engine platform for Komatsu equipment.

    Our Take

    Because the Komatsu JDA programme is framed as a JV rather than a simple supply or licensing deal, mining operators adopting the ammonia-fuelled engines are likely to see faster iteration on duty-cycle specific requirements (e.g. haul vs. loading), as both Komatsu and AFC Energy are contractually tied into co-developing the integrated system rather than delivering off‑the‑shelf components.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Resolution Copper $110m drilling, development push: key notes for mine planners

    Resolution Copper has let about $110 million in contracts to Major Drilling America and Redpath USA to accelerate exploration drilling and underground development at its proposed deep copper mine in Arizona. The work forms a major early tranche of an approximately $500 million post-FEIS investment programme, signalling a shift from study to execution-phase activities. For geotechnical and mining teams, this points to imminent ramp-up in underground access, drilling density, and ground characterisation data ahead of any full-scale shaft sinking or block-cave development decisions.

    Normet HX-Bolt hybrid support: design and seismic performance notes for mines
    Mining
    about 2 hours ago

    Normet HX-Bolt hybrid support: design and seismic performance notes for mines

    Normet has launched the HX-Bolt hybrid rock reinforcement system for underground mines, combining mechanical, frictional and bonded anchorage in a single bolt to handle variable and evolving ground conditions. The design targets rapid dynamic support immediately after installation while also providing long-term load capacity, aiming to bridge the gap between traditional mechanical anchors and fully grouted bolts in seismically active headings and development drives. For geotechnical engineers, the key change is a single bolt type that can be tuned to different ground behaviours without wholesale redesign of support patterns.

    Alice Queen’s Horn Island gold drilling: design and resource notes for mine planners
    Mining
    about 2 hours ago

    Alice Queen’s Horn Island gold drilling: design and resource notes for mine planners

    Alice Queen has remobilised a diamond drill rig to the Horn Island gold project in the Torres Strait, its first drilling there in several years, to test a recently defined exploration target. The rig will support a multi‑phase programme aimed at expanding known mineralisation around existing Horn Island pit shells and conceptual targets, rather than greenfield step‑outs. For geotechs and mine planners, new core data from this historically under‑drilled island deposit will refine structural models, grade continuity assumptions and potential open‑pit or underground design envelopes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental